Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS444 Mapping and Delivery Guide
Start and run-up a hydro turbine
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS444 - Start and run-up a hydro turbine |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to conduct safe hydro turbine run-ups to a stable operating condition.Run up of a hydro turbine will involve the operator making a sequence of checks prior to and during start up. This ensures that loading the turbine is completed in a safe and consistent manner. Competency in this unit requires the ability plan and prepare hydro turbine, start and run-up hydro turbine, test and analyse hydro turbine system faults and complete documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Run-up hydro turbine |
| |||||||
Element: Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures | ||||||||
Element: Preoperational checks are carried out on hydro turbine plant, in accordance with manufacturers' recommendations, workplace procedures and site requirements | ||||||||
Element: Turbine running up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures |
| |||||||
Element: Hydro turbine is monitored and observed to detect deviations from normal run up operating conditions | ||||||||
Element: Corrective actions are taken to rectify hydro turbine abnormalities, in accordance with manufacturers' recommendations and workplace procedures | ||||||||
Element: Alternator is synchronised and connected to electrical system, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Alternator is loaded, in accordance with workplace procedures, manufacturers' recommendations and regulators requirements | ||||||||
Element: Test hydro turbineplant operation |
| |||||||
Element: Power generation system and hydro turbine plant are observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Analyseand reportsystem faults |
| |||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |