Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate, inspect and monitor a hydro unit control and protection system.Hydro unit controls and protection systems provide operators with the facilities to control and supervise plant and equipment. Hydro unit control and protection systems help to ensure efficiency in critical applications such as turbine control, energy management and equipment protection.Competency in this unit requires the ability to plan work, carry out operation of hydro unit control and protection system, test hydro unit control and protection system operation, analyse hydro unit control and protection system faults, inspect and monitor hydro unit control and protection system and the completion of all documentation. Individuals will, in general, work under supervision, as an operator in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Work tasks, hydro unit control and protection system and type of start requirements are identified, in accordance with workplace procedures, from appropriate personnel and documentation | ||||||||
Element: Hydro unit control and protection system run-up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures and site requirements | ||||||||
Element: Inspection, preoperational tests and field preparation for hydro unit control and protection system service are carried out, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Hydro unit control and protection system operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Sequence for recommissioning of hydro unit control and protection system is determined, in accordance with workplace procedures | ||||||||
Element: Operate hydrocontrol and protection system |
| |||||||
Element: Hydro unit control and protection system is operated within limits of its' design and site requirements, in accordance with workplace procedures | ||||||||
Element: Hydro unit control and protection system is monitored and observed, in accordance with workplace procedures, to detect deviations from required operating conditions | ||||||||
Element: Corrective actions are taken to rectify hydro unit control and protection system abnormalities, in accordance with workplace procedures and manufacturers' recommendations | ||||||||
Element: Test hydro unit control and protection systemoperation |
| |||||||
Element: Hydro unit control and protection system is observed for correct operational response, in accordance with workplace procedures | ||||||||
Element: Analyse hydro unit control and protection systemfaults |
| |||||||
Element: Actions to rectify hydro unit control and protection system faults are correctly determined, in accordance with workplace procedures | ||||||||
Element: Monitor and inspect hydro unit control and protection system |
| |||||||
Element: Hydro unit control and protection system is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |