UEPOPS447 Mapping and Delivery Guide
Coordinate photovoltaic solar power plant operations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS447 - Coordinate photovoltaic solar power plant operations
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to undertake the coordination of photovoltaic solar power plant operations.A photovoltaic solar power plant operation typically consists of a large scale Photovoltaic System (P.V.) system designed for the supply of power into the electricity grid. The solar power source is via photovoltaic modules that convert light directly to electricity.Competency in this unit requires the ability to coordinate plant operations, monitor plant operations, test plant operations, analyse plant faultsand report operation against strategy requirements. Individuals will, in general, work as an operator with responsibility for photovoltaic solar power plant coordination, in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Test plant operation
  • Operational tests are performed on photovoltaic solar power plant, in accordance with workplace procedures
  • Photovoltaic solar power plant is observed for correct operational response, in accordance with workplace procedures
  • Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, photovoltaic solar power plant integrity or personnel safety requirements
  • Photovoltaic solar power plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
       
Element: Analyse plant faults
  • Causes of abnormal photovoltaic solar power plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
  • Corrective actions to rectify faults are determined, in accordance with workplace procedures
  • Photovoltaic solar power plant integrity and personnel safety are maintained, in accordance with workplace procedures, and through consultation with personnel and technical and operational documentation
  • Appropriate personnel, including specialists, are arranged for investigation of identified photovoltaic solar power plant operational abnormalities, in accordance with workplace procedures
       
Element: Coordinate plant operations
  • Photovoltaic solar power plant operational procedures are implemented, in accordance with workplace procedures
       
Element: Resources and supplies are coordinated to meet photovoltaic solar power plant requirements, in accordance with workplace procedures
       
Element: Monitor plant operations
  • Deviations from photovoltaic solar power plant operations are identified and recorded, in accordance with workplace procedures
       
Element: Photovoltaic solar power plant operation and condition is monitored, in accordance with workplace procedures and legislative requirements
       
Element: Requirements that may impact on photovoltaic solar power plant operations are monitored, in accordance with workplace procedures
       
Element: Photovoltaic solar power plant operations are monitored to meet legislative, industry and site requirements, in accordance with workplace procedures
  • Operational tests are performed on photovoltaic solar power plant, in accordance with workplace procedures
       
Element: Photovoltaic solar power plant is observed for correct operational response, in accordance with workplace procedures
       
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, photovoltaic solar power plant integrity or personnel safety requirements
       
Element: Photovoltaic solar power plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
  • Causes of abnormal photovoltaic solar power plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
       
Element: Corrective actions to rectify faults are determined, in accordance with workplace procedures
       
Element: Photovoltaic solar power plant integrity and personnel safety are maintained, in accordance with workplace procedures, and through consultation with personnel and technical and operational documentation
       
Element: Appropriate personnel, including specialists, are arranged for investigation of identified photovoltaic solar power plant operational abnormalities, in accordance with workplace procedures
       
Element: Report operation against strategy requirements
  • Data is collected and processed for review, in accordance with workplace procedures and operational strategy
       
Element: Photovoltaic solar power plant operation or condition is reported, in accordance with workplace procedures and legislative requirements
       
Element: Abnormal photovoltaic solar power plant operating conditions are reported, in accordance with workplace procedures
       
Element: Changes to operational strategy are coordinated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Operational tests are performed on photovoltaic solar power plant, in accordance with workplace procedures 
Photovoltaic solar power plant is observed for correct operational response, in accordance with workplace procedures 
Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, photovoltaic solar power plant integrity or personnel safety requirements 
Photovoltaic solar power plant is returned to required operational status upon completion of testing, in accordance with workplace procedures 
Causes of abnormal photovoltaic solar power plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information 
Corrective actions to rectify faults are determined, in accordance with workplace procedures 
Photovoltaic solar power plant integrity and personnel safety are maintained, in accordance with workplace procedures, and through consultation with personnel and technical and operational documentation 
Appropriate personnel, including specialists, are arranged for investigation of identified photovoltaic solar power plant operational abnormalities, in accordance with workplace procedures 
Photovoltaic solar power plant operational procedures are implemented, in accordance with workplace procedures 
 
Deviations from photovoltaic solar power plant operations are identified and recorded, in accordance with workplace procedures 
 
 
Operational tests are performed on photovoltaic solar power plant, in accordance with workplace procedures 
 
 
Causes of abnormal photovoltaic solar power plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information 
 
 
 
Data is collected and processed for review, in accordance with workplace procedures and operational strategy 
 
 
 

Forms

Assessment Cover Sheet

UEPOPS447 - Coordinate photovoltaic solar power plant operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS447 - Coordinate photovoltaic solar power plant operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date: