Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS452 Mapping and Delivery Guide
Conduct operational checks and carry out corrective action on in-service electrical plant

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS452 - Conduct operational checks and carry out corrective action on in-service electrical plant
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to conduct operational checks and carry out corrective actions on in-service electrical plant.An operational check is the verification that a group of components or units are working together to accomplish a single objective. An operational check consists of running in-service electrical plant to ensure that all the systems function together. Competency in this unit requires the ability to plan for plant in-service checks,carry out in-service electrical checks,carry out corrective actions and complete work. Individuals will, in general, work as an operator in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practicesThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Complete work
  • Operational checks and corrective actions are completed, and electrical in-service plant is returned to operational status, in accordance with workplace procedures
  • Appropriate personnel are notified of work completion, in accordance with workplace procedures
  • Electrical in-service plant problems and corrective actions are reported, in accordance with workplace procedures
       
Element: Plan for plant in-service checks
  • Safety issues and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations are identified, in accordance with workplace procedures
       
Element: Work, electrical in-service plant and resource requirements are identified from relevant personnel, work orders and documentation, in accordance with workplace procedures
       
Element: Electrical in-service plant status and work requirements are confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
       
Element: Equipment is checked for correct calibration and operation and materials are obtained and inspected for compliance with job specification, in accordance with workplace procedures
       
Element: Potential hazards are identified and risk control measures are selected, in accordance with the workplace procedures
       
Element: Pre-access checks of electrical in-service plant are carried out, in accordance with workplace procedures and site requirements
       
Element: Carry out in-service electrical checks
  • Electrical in-service plant is operated, in accordance with workplace procedures and manufacturers' recommendations
       
Element: Electrical in-service plant checks are conducted and monitored, in accordance with workplace procedures, to detect deviations from normal operation parameters
       
Element: Electrical in-service checks are performed, in accordance with workplace procedures
       
Element: Electrical in-service plant integrity and personnel safety are maintained, in accordance with workplace procedures and in consultation with appropriate personnel and technical and operational documentation
       
Element: Carry out corrective actions
  • Corrective actions are identified after analysing electrical in-service plant operations, in accordance with manufacturers' recommendations and workplace procedures
       
Element: Isolations are confirmed, where appropriate, in accordance with workplace procedures and site requirements
       
Element: Equipment for use in conducting operational checks is modified using appropriate plans, drawings and manuals, in accordance with workplace procedures
       
Element: Corrective actions are carried out on electrical in-service plant, without damage or loss to other plant, in accordance with workplace procedures
       
Element: Modified electrical in-service plant is set up to meet operational parameters, in accordance with workplace procedures and manufacturers specifications
       
Element: Final electrical in-service plant inspection is performed, in accordance with workplace procedures
  • Operational checks and corrective actions are completed, and electrical in-service plant is returned to operational status, in accordance with workplace procedures
       
Element: Appropriate personnel are notified of work completion, in accordance with workplace procedures
       
Element: Electrical in-service plant problems and corrective actions are reported, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Operational checks and corrective actions are completed, and electrical in-service plant is returned to operational status, in accordance with workplace procedures 
Appropriate personnel are notified of work completion, in accordance with workplace procedures 
Electrical in-service plant problems and corrective actions are reported, in accordance with workplace procedures 
Safety issues and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations are identified, in accordance with workplace procedures 
 
 
 
 
 
Electrical in-service plant is operated, in accordance with workplace procedures and manufacturers' recommendations 
 
 
 
Corrective actions are identified after analysing electrical in-service plant operations, in accordance with manufacturers' recommendations and workplace procedures 
 
 
 
 
Operational checks and corrective actions are completed, and electrical in-service plant is returned to operational status, in accordance with workplace procedures 
 
 

Forms

Assessment Cover Sheet

UEPOPS452 - Conduct operational checks and carry out corrective action on in-service electrical plant
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS452 - Conduct operational checks and carry out corrective action on in-service electrical plant

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: