Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS512 Mapping and Delivery Guide
Manage high voltage network system

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS512 - Manage high voltage network system
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to manage a High Voltage (H.V.) network system that may be interconnected, remote or isolated.Operators seek to optimise and manage H.V. network systems that are deployed to supply, transfer and store electrical power through efficient and safe operations at power generation facilities. This includes identifying faults, taking corrective actions and using protection programs to ensure network system stability.Competency in this unit requires the ability to plan network system operations, manage and control network system, analyse and respond to network system faults or incidents,review incident response and preventative procedures and the completion of all documentation. Individuals will, in general, work as an operator with responsibility for managing a H.V. network system, in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare network systemoperations
  • Information and documentation to determine power generation network system status is assessed and evaluated, in accordance with High Voltage (H.V.) system operating requirements
       
Element: Power generation network system and associated equipment operational prerequisites are established, in accordance with H.V. system operating procedures
       
Element: Sequence for operation of power generation network system sections and equipment is created for a range of potential scenarios, in accordance with H.V. system operating procedures
       
Element: Power generation network system forecast is based on assessment of data and relevant information, in accordance with H.V. system operating procedures
       
Element: Manage and control network system
  • Power generation network system is operated and managed, in accordance with H.V. system operating procedures
       
Element: Power generation network system demand is managed using a contingency plan and strategies to maintain quality of supply, in accordance with legislative requirements and H.V. system operating procedures
       
Element: Power generation network system voltage and current requirements are assessed, evaluated and managed to maintain stability and H.V. system integrity
       
Element: Voltage load profiles are identified and adhered to, in accordance with power generation network system, to minimise transmission losses
       
Element: Power generation network system load shedding sequence and priorities are monitored and managed, to ensure H.V. system integrity
       
Element: Power generation network system data is monitored and managed, for normal operation or to detect deviations
       
Element: Corrective actions to rectify abnormalities in power generation network system are implemented, following assessment of data, in accordance with H.V. system operating procedures
       
Element: Resources to meet power generation network system requirements are managed, in accordance with H.V. system operating procedures
       
Element: Analyse and respond to network system faults
  • Causes of power generation abnormal network system operating conditions are identified by analysing technical and operational information, in accordance with H.V. system operating procedures
       
Element: Operation and management of power generation network system protection program is evaluated to determine nature and cause of faults
       
Element: Communication with key stakeholders is established managed, to assist in identifying nature and source of H.V. system interference
       
Element: Corrective action is taken, in accordance with H.V. system operating procedures
       
Element: Power generation network system integrity and personnel safety are managed, in accordance with H.V. system operating procedures, and in consultation with appropriate personnel and technical and operational documentation including contingency plans
       
Element: Review incident response and preventative procedures
  • Power generation facility network system incident responses are assessed and reviewed, in accordance with system operating procedures
       
Element: Alternative responses to contingencies are identified and assessed, in accordance with system operating procedures
       
Element: Alternative responses to contingencies are documented and managed, in accordance with system operating procedures
       
Element: Complete documentation
  • Network system problems, movements and status is reported, in accordance with workplace and system operating procedures
       
Element: Documentation is updated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Information and documentation to determine power generation network system status is assessed and evaluated, in accordance with High Voltage (H.V.) system operating requirements 
 
 
 
Power generation network system is operated and managed, in accordance with H.V. system operating procedures 
 
 
 
 
 
 
 
Causes of power generation abnormal network system operating conditions are identified by analysing technical and operational information, in accordance with H.V. system operating procedures 
 
 
 
 
Power generation facility network system incident responses are assessed and reviewed, in accordance with system operating procedures 
 
 
Network system problems, movements and status is reported, in accordance with workplace and system operating procedures 
 

Forms

Assessment Cover Sheet

UEPOPS512 - Manage high voltage network system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS512 - Manage high voltage network system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: