Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS514 Mapping and Delivery Guide
Control hydro generation pumping

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS514 - Control hydro generation pumping
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to undertake the control of hydro generation pumping through remote control of hydro generating plant.Hydro pumping is a system for generating hydroelectricpower for peak periods. This is performed bypumping water from a lower to a higher reservoir during low demand periods and then releasing it during peak periods.Competency in this unit requires the ability to maintain key indicator limits, operate remote hydro plant, maintain policies and procedures and complete work. Individuals will, in general, work as an operator, in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Maintain key indicator limits
  • Pond levels, power station discharges, plant voltage and current limits, frequency and time errors are maintained, in accordance with workplace procedures and manufacturers' specifications
       
Element: Hydro generation plant is run at peak efficiency, or to the load schedule, avoiding rough running zones, in accordance with workplace procedures
       
Element: Operate remote hydro plant
  • Hydro generation power plant is remotely stopped, started, loaded and unloaded, in accordance with workplace procedures and the operating regimes dictated by the electricity generation schedule
       
Element: Power generating plant is remotely switched in and out of synchronous condenser operation, as required, in accordance with workplace procedures
       
Element: Maintain policiesand procedures
  • Communication procedures used to alert public of increased river flows, in accordance with workplace procedures
       
Element: Minimum river flows are maintained, in accordance with workplace procedures and agreed limits
       
Element: Water storage levels are monitored and maintained, in accordance with workplace procedures, legislative requirements and policy guidelines
       
Element: Complete documentation
  • Equipment problems, movements, and status are reported, in accordance with workplace procedures
       
Element: Documentation is updated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Pond levels, power station discharges, plant voltage and current limits, frequency and time errors are maintained, in accordance with workplace procedures and manufacturers' specifications 
 
Hydro generation power plant is remotely stopped, started, loaded and unloaded, in accordance with workplace procedures and the operating regimes dictated by the electricity generation schedule 
 
Communication procedures used to alert public of increased river flows, in accordance with workplace procedures 
 
 
Equipment problems, movements, and status are reported, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPOPS514 - Control hydro generation pumping
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS514 - Control hydro generation pumping

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: