Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS514 Mapping and Delivery Guide
Control hydro generation pumping
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS514 - Control hydro generation pumping |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to undertake the control of hydro generation pumping through remote control of hydro generating plant.Hydro pumping is a system for generating hydroelectricpower for peak periods. This is performed bypumping water from a lower to a higher reservoir during low demand periods and then releasing it during peak periods.Competency in this unit requires the ability to maintain key indicator limits, operate remote hydro plant, maintain policies and procedures and complete work. Individuals will, in general, work as an operator, in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Maintain key indicator limits |
| |||||||
Element: Hydro generation plant is run at peak efficiency, or to the load schedule, avoiding rough running zones, in accordance with workplace procedures | ||||||||
Element: Operate remote hydro plant |
| |||||||
Element: Power generating plant is remotely switched in and out of synchronous condenser operation, as required, in accordance with workplace procedures | ||||||||
Element: Maintain policiesand procedures |
| |||||||
Element: Minimum river flows are maintained, in accordance with workplace procedures and agreed limits | ||||||||
Element: Water storage levels are monitored and maintained, in accordance with workplace procedures, legislative requirements and policy guidelines | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |