Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS526 Mapping and Delivery Guide
Coordinate electrical energy production

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPOPS526 - Coordinate electrical energy production
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to coordinate the safe and effective management of energy production to meet demand on an electricity generating unit.Power utilities match demand and supply through adjusting the production rate of theirpower generating facilities. This is achieved by taking generating units online and offline or through importing power from other utilities.Competency in this unit requires the ability to coordinate unit operations,monitor network system and power generating plant, analyse network system and power generating plant faults and complete all documentation. Individuals will, in general, work as an operator with responsibility for coordinating electrical energy production, in a power generation facility.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Coordinate unit operations
  • Electricity generating unit is operated, in accordance with workplace procedures, industry standards and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations to meet demand requirements whilst observing power generating plant limitations
       
Element: Electricity generating unit is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
       
Element: Causes of abnormal operating conditions in electricity generating unit is identified, in accordance with workplace procedures, by analysing technical and operational information
       
Element: Corrective actions are taken to rectify electricity generating unit abnormalities, in accordance with workplace procedures and site requirements
       
Element: Electricity generating unit's integrity personnel safety and continuity of supply are maintained, in accordance with workplace procedures
       
Element: Consultation with appropriate personnel is undertaken, as required, in accordance with workplace procedures
       
Element: Electricity generating unit is operated at optimum efficiency, in accordance with workplace procedures
       
Element: Monitoring unit and plant
  • Electricity generating unit and power generating plant to be monitored is physically identified, in accordance with workplace procedures
       
Element: Electricity generating unit and power generating plant is monitored, in accordance with workplace procedures, for normal operation or to detect deviations
       
Element: Corrective action is taken, in accordance with workplace procedures
       
Element: Appropriate personnel are notified, in accordance with workplace procedures, when defects and abnormal operating conditions in electricity generating unit and power generating plant are detected
       
Element: Testunit andplant operation
  • Operational tests are performed, in accordance with workplace procedures
       
Element: Electricity generating unit and power generating plant is observed, in accordance with workplace procedures, for correct operational response
       
Element: Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, electricity generating unit and power generating plant integrity or personnel safety requirements
       
Element: Electricity generating unit and power generating plant is returned to operational status, in accordance with workplace procedures, upon completion of testing
       
Element: Analyse unitand plant faults
  • Causes of abnormal electricity generating unit operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
       
Element: Corrective actions to rectify faults are determined, in accordance with workplace procedures
       
Element: Electricity generating unit and power generating plant integrity and personnel safety are maintained, in accordance with workplace procedures, through consultation with personnel and technical and operational documentation
       
Element: Appropriate personnel, including specialists, are arranged for investigation of identified operational abnormalities, in accordance with workplace procedures
       
Element: Complete documentation
  • Electricity generating unit and power generation plant problems, movements and status are reported, in accordance with workplace procedures
       
Element: Documentation is updated, in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Electricity generating unit is operated, in accordance with workplace procedures, industry standards and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations to meet demand requirements whilst observing power generating plant limitations 
 
 
 
 
 
 
Electricity generating unit and power generating plant to be monitored is physically identified, in accordance with workplace procedures 
 
 
 
Operational tests are performed, in accordance with workplace procedures 
 
 
 
Causes of abnormal electricity generating unit operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information 
 
 
 
Electricity generating unit and power generation plant problems, movements and status are reported, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPOPS526 - Coordinate electrical energy production
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS526 - Coordinate electrical energy production

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: