Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETDRDS023 Mapping and Delivery Guide
Draft and layout distribution substation minor upgrade

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UETDRDS023 - Draft and layout distribution substation minor upgrade
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to draft and layout distribution substation minor upgrade
  • Project requirements are determined
       
Element: Draft and layout specifications are determined in accordance with workplace requirements
       
Element: Tools, equipment and personal protective equipment (PPE) required for site inspections are determined, obtained and confirmed in working order
       
Element: Requirements for site inspections are determined in accordance with workplace requirements
       
Element: Work is prioritised and sequenced for completion in accordance with workplace requirements
       
Element: Draft and layout distribution substation minor upgrade
  • Site inspection is performed
       
Element: Substation minor upgrade is drafted and laid out in accordance with workplace requirements
       
Element: Systems modelling is used to evaluate and determine best outcomes in accordance with workplace requirements
       
Element: Sustainable energy principles are used to evaluate and determine best outcomes in accordance with workplace requirements
       
Element: Draft and layout are checked for compliance against legislation, regulations, standards and codes of practice
       
Element: Health and safety risks are identified and minimised or eliminated by using safety and control measures in the draft and layout process
       
Element: Quality checks of work are undertaken in accordance with workplace requirements
       
Element: Complete work and documentation
  • Completed work is checked against project and workplace requirements
       
Element: Work records, reports and documentation are completed, approved and appropriate personnel notified in accordance with workplace requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Project requirements are determined 
 
 
 
 
Site inspection is performed 
 
 
 
 
 
 
Completed work is checked against project and workplace requirements 
 

Forms

Assessment Cover Sheet

UETDRDS023 - Draft and layout distribution substation minor upgrade
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETDRDS023 - Draft and layout distribution substation minor upgrade

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: