Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETDRDU021 Mapping and Delivery Guide
Joint, terminate and maintain underground polymeric cable 33kV and above
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UETDRDU021 - Joint, terminate and maintain underground polymeric cable 33kV and above |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to joint, terminate and maintain underground polymeric cable |
| |||||||
Element: Work plan is obtained and confirmed in accordance with workplace requirements | ||||||||
Element: Materials required for work are determined and obtained in accordance with work plan and workplace requirements | ||||||||
Element: Tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order | ||||||||
Element: Hazards are identified, risks assessed and control measures identified and applied | ||||||||
Element: Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements | ||||||||
Element: Worksite is prepared in accordance with the work plan and workplace requirements | ||||||||
Element: Joint and terminate underground polymeric cable |
| |||||||
Element: Manual handling, working in confined spaces and the use of tools, equipment and PPE are carried out in accordance with workplace requirements | ||||||||
Element: Hazard control measures are monitored in accordance with workplace requirements | ||||||||
Element: Cable is tested before jointing or terminating in accordance with the work plan and workplace requirements | ||||||||
Element: Cable is prepared for jointing or terminating in accordance with manufacturer’s instructions and workplace requirements | ||||||||
Element: Cable is jointed or terminated in accordance with manufacturer’s instructions and workplace requirements | ||||||||
Element: Cable is tested after joining or terminating in accordance with the work plan and workplace requirements | ||||||||
Element: Quality checks of work are undertaken in accordance with work plan and workplace requirements | ||||||||
Element: Maintain underground polymeric cable |
| |||||||
Element: Manual handling working in confined spaces and the use of tools, equipment and PPE are followed in accordance with workplace requirements | ||||||||
Element: Cable is identified and spiked or cut in accordance with workplace requirements | ||||||||
Element: Work permits are received and signed in accordance with workplace requirements | ||||||||
Element: Cable is tested in accordance with the work plan and workplace requirements | ||||||||
Element: Cable is prepared for maintenance in accordance with manufacturer’s instructions and workplace requirements | ||||||||
Element: Cable is maintained in accordance with manufacturer’s instructions and workplace requirements | ||||||||
Element: Work permits are signed off in accordance with workplace requirements | ||||||||
Element: Cable, cable joint and termination are tested in accordance with the work plan and workplace requirements | ||||||||
Element: Quality checks of work are undertaken in accordance with work plan and workplace procedures | ||||||||
Element: Complete work and documentation |
| |||||||
Element: Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements | ||||||||
Element: Tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements | ||||||||
Element: Surplus materials are returned to storage or disposed of in accordance with workplace requirements | ||||||||
Element: Work records, reports and documentation are completed in accordance with workplace requirements |