Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETDRIS030 Mapping and Delivery Guide
Install high voltage mobile generator
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETDRIS030 - Install high voltage mobile generator |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install HV mobile generator |
| |||||||
Element: Work plan is obtained, confirmed and communicated with relevant personnel in accordance with workplace requirements | ||||||||
Element: Materials required for work are determined and obtained in accordance with work plan and workplace requirements | ||||||||
Element: Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order | ||||||||
Element: Hazards are identified, risks assessed and control measures identified and applied | ||||||||
Element: Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements | ||||||||
Element: Worksite is prepared in accordance with the work plan and workplace requirements | ||||||||
Element: Install HV mobile generator |
| |||||||
Element: Work permits are received and signed in accordance with workplace requirements | ||||||||
Element: Lifting, working at heights, working in confined spaces and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements | ||||||||
Element: Hazard control measures are monitored in accordance with workplace requirements | ||||||||
Element: HV mobile generator is installed in accordance with workplace requirements | ||||||||
Element: HV mobile generator is synchronised to HV network in accordance with the work plan and workplace requirements | ||||||||
Element: HV mobile generator is monitored in accordance with the work plan and workplace requirements | ||||||||
Element: Complete work and documentation |
| |||||||
Element: Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements | ||||||||
Element: Work permits are signed off in accordance with workplace requirements | ||||||||
Element: Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements | ||||||||
Element: Surplus materials are returned to storage or disposed of in accordance with workplace requirements | ||||||||
Element: Work records, reports and documentation are completed in accordance with workplace requirements |