Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETDRMP011 Mapping and Delivery Guide
Testing of connections to low voltage electricity networks

Version 1.0
Issue Date: June 2024


Qualification -
Unit of Competency UETDRMP011 - Testing of connections to low voltage electricity networks
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to perform test procedures
  • Workplace requirements for perform testing of connections are identified and confirmed
       
Element: Hazards are identified, risks assessed, and control measures identified and applied
       
Element: Tools, equipment and personal protective equipment (PPE) required for testing are determined, obtained and confirmed in working order
       
Element: Carry out test procedures
  • Hazard control measures are monitored in accordance with workplace requirements
       
Element: Use of tools, equipment and PPE for testing are carried out in accordance with workplace requirements
       
Element: Testing of connections to electricity networks are conducted in accordance with workplace requirements and AS4741
       
Element: Corrective actions are undertaken in accordance with workplace requirements
       
Element: Complete the test procedures
  • Test results are recorded in accordance with workplace requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Workplace requirements for perform testing of connections are identified and confirmed 
 
 
Hazard control measures are monitored in accordance with workplace requirements 
 
 
 
Test results are recorded in accordance with workplace requirements 

Forms

Assessment Cover Sheet

UETDRMP011 - Testing of connections to low voltage electricity networks
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETDRMP011 - Testing of connections to low voltage electricity networks

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: