Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETDRRT015 Mapping and Delivery Guide
Maintain energised rail traction networks

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UETDRRT015 - Maintain energised rail traction networks
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to maintain energised rail traction networks
  • Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
       
Element: Required design standards and maintenance documents are identified and obtained
       
Element: Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
       
Element: Hazards are identified, risks assessed, and control measures identified and applied
       
Element: Work is prioritised and sequenced for completion in accordance with workplace requirements
       
Element: Work permits are organised in accordance with workplace requirements
       
Element: Worksite, road or rail management plan is prepared in accordance with workplace requirements
       
Element: Maintain energised rail traction networks
  • Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
       
Element: Plant, tools, equipment and PPE are used in accordance with workplace requirements
       
Element: Hazard control measures are monitored in accordance with workplace requirements
       
Element: Incidents or unplanned events are responded to in accordance with workplace requirements
       
Element: Work is carried out on energised rail traction networks in accordance with workplace requirements
       
Element: Quality checks of work are undertaken in accordance with workplace requirements and to ensure fit for service
       
Element: Complete work and documentation
  • Completed work is checked against maintenance documents for compliance in accordance with workplace requirements
       
Element: Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
       
Element: Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements
       
Element: Work permits are completed, and overhead traction equipment or components are confirmed fit for service in accordance with workplace requirements
       
Element: Incidents or unplanned events are reported in accordance with workplace requirements
       
Element: Work records, reports and documentation are completed in accordance with workplace requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed 
 
 
 
 
 
 
Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored 
 
 
 
 
 
Completed work is checked against maintenance documents for compliance in accordance with workplace requirements 
 
 
 
 
 

Forms

Assessment Cover Sheet

UETDRRT015 - Maintain energised rail traction networks
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETDRRT015 - Maintain energised rail traction networks

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: