Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRCJ26 Mapping and Delivery Guide
Install and maintain de-energised low voltage underground polymeric cables
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRCJ26 - Install and maintain de-energised low voltage underground polymeric cables |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install and maintain de-energised low voltage (LV) underground polymeric cables in the electricity supply industry (ESI).It includes jointing, terminating, repairing and replacing cables using a range of equipment, tools and materials. It also includes the isolation of systems and circuits, issuing/accepting electrical access permits, undertaking pre-commissioning and/or re-commissioning tests and updating system data/maintenance records.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Cable Jointing |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install and maintain de-energised LV underground polymeric cables |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and maintenance of de-energised LV underground polymeric cables are obtained and confirmed for the purposes of the work to be performed | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: WHS/OHS and environmental hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures | ||||||||
Element: Relevant work permits are confirmed and signed in accordance with workplace procedures | ||||||||
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Traffic management plan is confirmed as being applied in accordance with workplace procedures | ||||||||
Element: Carry out the installation and maintenance of de-energised LV underground polymeric cables |
| |||||||
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Systems and circuits are isolated as required, proved safe to work on in accordance with workplace procedures | ||||||||
Element: De-energised LV underground polymeric cables are installed in accordance with the work schedule and workplace procedures | ||||||||
Element: Maintenance, including repair and/or replacement of de-energised LV underground polymeric cables is carried out in accordance with the work schedule and workplace procedures | ||||||||
Element: Unplanned events are responded to in accordance with workplace procedures | ||||||||
Element: Quality checks of work are undertaken in accordance with workplace procedures | ||||||||
Element: Complete installation and maintenance of de-energised LV underground polymeric cables |
| |||||||
Element: WHS/OHS and environmental incidents are reported in accordance with workplace procedures as required | ||||||||
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources are, where appropriate, are cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off and LV underground polymeric cables are returned to service in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |