Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRCJ99A Mapping and Delivery Guide
Test and verify distribution cable jointing installations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRCJ99A - Test and verify distribution cable jointing installations |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the installation and maintenance of de-energised high voltage and low voltage underground polymeric cables and includes underground services, network infrastructure, the jointing, terminating and repair of cables. It encompasses working safely, visual inspections and mandatory and functional test procedures, identifying non-compliance defects and mandatory reporting requirements | ||
Employability Skills | 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):Common Unit GroupUnit Code Unit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE104A Solve problems in d.c. CircuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in low voltage a.c. CircuitsUETTDRCJ21A Lay ESI electrical cables UETTDRCJ26A Install and maintain de-energised low voltage underground polymeric cables. UETTDRCJ27A Install and maintain de-energised high voltage underground polymeric cables. UETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDREL16A Working safely near live electrical apparatus UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS55A Install and maintain low voltage underground services Literacy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”.Reading3Writing3Numeracy3 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for jointing LV and HV underground polymeric cables and LV services |
| |||||||
Element: Relevant requirements and established procedures for the work are communicated to all personnel and identified for all work sites. | ||||||||
Element: OHS policies and procedures related to requirements and established procedures for the installation of electrical equipment (network infrastructure) are obtained and confirmed for the purposes of the work to be performed and communicated. | ||||||||
Element: Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures. | ||||||||
Element: Hazards are identified; OHS risks assessed and control measures are prioritised, implemented and monitored including emergency exits kept clear according to established procedures. | ||||||||
Element: | ||||||||
Element: Relevant work permits are obtained to access and perform work according to requirements and/or established procedures |
| |||||||
Element: Relevant personnel at worksite are confirmed current in First Aid and other related work procedures according to requirements. | ||||||||
Element: Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary. | ||||||||
Element: Site is prepared according to the work schedule and to minimise risk and damage to property, commerce, and individuals in accordance with established procedures. | ||||||||
Element: Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed where applicable in accordance with established procedures. | ||||||||
Element: Road signs, barriers and warning devices are positioned in accordance with requirements. | ||||||||
Element: Carry out the jointing LV and HV underground polymeric cables and LV services |
| |||||||
Element: Maintenance, including repair and/or replacement of low voltage and high voltage underground polymeric cables is carried out, in accordance with the work schedule and requirements / established procedures. |
| |||||||
Element: Complete jointing LV and HV underground polymeric cables and LV services |
|