Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRDP11 Mapping and Delivery Guide
Inspect overhead poles-structures and electrical apparatus
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UETTDRDP11 - Inspect overhead poles-structures and electrical apparatus |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to inspect overhead poles-structures and electrical apparatus in the electricity supply industry (ESI).It includes inspection of overhead conductors and/or cables, underground and overhead transition points, pole-mounted transformers, switchgear, hardware and/or earthing systems. It also includes the completion of inspection reports and other relevant documentation.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Distribution |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to inspect overhead structures and electrical apparatus used on poles-structures |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Work health and safety (WHS)/ occupational health and safety (OHS), environmental and workplace procedures for the inspection of overhead structures and electrical apparatus used on poles and/or structures are obtained and confirmed for the purposes of the work to be performed and communicated | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures | ||||||||
Element: Relevant work permits are obtained, understood and signed in accordance with workplace procedures | ||||||||
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work is identified, obtained and confirmed in working order | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Traffic management plan is confirmed as being applied in accordance with workplace procedures | ||||||||
Element: Inspecting overhead structures and electrical apparatus used on poles-structures |
| |||||||
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Inspection of overhead poles-structures and electrical apparatus is completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures | ||||||||
Element: Inspection of overhead structures and electrical apparatus is performed in accordance with job schedules, work requirements and workplace procedures | ||||||||
Element: Unplanned events in the inspection of overhead poles-structures and electrical apparatus are responded to in accordance with workplace procedures | ||||||||
Element: Quality checks of work are undertaken in accordance with workplace procedures | ||||||||
Element: Complete inspection of overhead structures and electrical apparatus used on poles-structures |
| |||||||
Element: WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required | ||||||||
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off and overhead structures and electrical apparatus used on poles-structures are returned to service in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |