Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRIS03B Mapping and Delivery Guide
Perform LV field switching operation to a given schedule.
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRIS03B - Perform LV field switching operation to a given schedule. |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the conducting of low voltage switching operations involving the operation of circuit breaking and isolation devices from a given switching schedule and in accordance with enterprise procedures. It covers low voltage distribution systems in field situations but also includes paralleling in accordance with the switching schedule. It also encompasses the procedure of; communicating with the Switching Control Officer or Electrical Control Officer, isolating the electrical equipment and the line or work site, as well as proving that the area is de-energised and earthed, issuing/accepting electrical permits and the returning of the affected circuits to service. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed: UETTDRCJ03B Install and maintain de-energised HV underground paper insulated cables or UETTDRCJ07B Install and maintain de-energised HV underground polymeric insulated cables or UETTDRIS02B Maintain electrical equipment (network infrastructure) or UETTDRIS14B Install and maintain overhead conductors and cables (poles and structures) or UETTDRTP09B Install and maintain overhead conductors and cables (towers) For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for the LV field switching to a given schedule |
| |||||||
Element: Carry out LV field switching to a given schedule |
| |||||||
Element: Complete the LV field switching to a given schedule |
|