Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRIS04B Mapping and Delivery Guide
Perform high voltage field switching operation to a given schedule
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRIS04B - Perform high voltage field switching operation to a given schedule |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the carrying out of high voltage switching operations involving the operation of circuit breaking and isolation devices from a given switching schedule and according to enterprise procedures. It also encompasses the process of; communicating with the Switching Control Officer or Electrical Control Officer, isolating the electrical equipment and the line or work site, as well as proving that the area is de-energised and earthed, issuing/accepting electrical permits and the returning of the affected circuits to service. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRCJ03B Install and maintain de-energised HV underground paper insulated cables or UETTDRCJ07B Install and maintain de-energised HV underground polymeric insulated cables or UETTDRIS02B Maintain electrical equipment (network infrastructure) or UETTDRIS14B Install and maintain overhead conductors and cables (poles and structures) or UETTDRTP09B Install and maintain overhead conductors and cables (towers) For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to undertake HV switching procedures to a given schedule |
| |||||||
Element: Carry out HV switching procedures to a given schedule |
| |||||||
Element: Complete HV switching procedures to a given schedule |
|