Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRIS15B Mapping and Delivery Guide
Install and maintain low voltage services (underground)
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRIS15B - Install and maintain low voltage services (underground) |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the installation, maintenance and connection of low voltage underground service lines and associated equipment (between the connection point and the point of supply - customers' premises). Maintenance includes the repair and replacement of service cables, service fuses and the replacement and repair of service hardware, the identification and rectification of faults. It also covers insulation, voltage, polarity testing and phase rotation. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRCJ03B Install and maintain de-energised HV underground paper insulated cables or UETTDRCJ07B Install and maintain de-energised HV underground polymeric insulated cables or UETTDRIS02B Maintain electrical equipment (network infrastructure) or UETTDRIS14B Install and maintain overhead conductors and cables (poles and structures) or UETTDRTP09B Install and maintain overhead conductors and cables (towers) For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for the installation and maintenance of LV underground services and associated equipment |
| |||||||
Element: Carry out installation and maintenance of LV underground services and associated equipment |
| |||||||
Element: Complete the installation and maintenance of LV underground services and associated equipment |
|