Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRIS57A Mapping and Delivery Guide
Conduct visual checking and treatment of power system poles and structures
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UETTDRIS57A - Conduct visual checking and treatment of power system poles and structures |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the conducting of ground line inspection and treatment of poles and structures in accordance with enterprise procedures. It includes work associated with testing or examining, at eye level to below ground and the visual checking above ground of the crossarm and hardware attached with the use of binoculars, so as to determine the integrity of the poles, structures and hardware attached to them. It also encompasses the completion of inspection reports and the updating of records to enterprise requirements. | ||
Employability Skills | 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):Transmission OverheadDistribution OverheadRail TractionDistribution Cable JointingElectrotechnology Systems ElectricianCommon Unit GroupUnit CodeUnit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE104A Solve problems in d.c. CircuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in low voltage a.c. CircuitsUETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDREL16A Working safely near live electrical apparatus Transmission Overhead Pathway Group Unit CodeUnit TitleUETTDRIS54A Install and maintain poles, structures, overhead conductors and cables UETTDRTP26A Install transmission structures and associated hardware UETTDRTP27A Maintain transmission structures and associated hardware UETTDRTP29A Install and maintain transmission overhead conductors and cables UETTDRTP30A Inspect transmission overhead structures and electrical apparatus Distribution Overhead Pathway GroupUnit CodeUnit TitleUETTDRDP11A Inspect overhead poles/structures and electrical apparatus UETTDRDP12A Maintain overhead energised low voltage conductors and cables UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS52A Install and maintain poles, structures and associated hardwareUETTDRIS54A Install and maintain poles, structures, overhead conductors and cables UETTDRIS56A Install and maintain low voltage overhead services Rail Traction Pathway GroupUnit CodeUnit TitleUETTDRIS52A Install and maintain poles, structures and associated hardwareUETTDRIS54A Install and maintain poles, structures, overhead conductors and cables UETTDRRT21A Install traction overhead wiring systems UETTDRRT22A Maintain traction overhead wiring systems UETTDRRT23A Install rail traction bonds UETTDRRT27A Install overhead traction components and equipment UETTDRRT28A Maintain overhead traction components and equipment Distribution Cable Jointing Pathway GroupUnit CodeUnit TitleUETTDRCJ21A Lay ESI electrical cables UETTDRCJ26A Install and maintain de-energised low voltage underground polymeric cables. UETTDRCJ27A Install and maintain de-energised high voltage underground polymeric cables. UETTDRDP11A Inspect overhead poles/structures and electrical apparatus UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS55A Install and maintain low voltage underground services Literacy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”Reading3Writing3Numeracy3 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to perform visual checking and treatment of poles and structures |
| |||||||
Element: Carry out visual checking and treatment of poles and structures |
| |||||||
Element: Complete the visual checking and treatment of poles and structures |
|