Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETTDRIS67 Mapping and Delivery Guide
Solve problems in energy supply network equipment

Version 1.0
Issue Date: June 2024


Qualification -
Unit of Competency UETTDRIS67 - Solve problems in energy supply network equipment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to solve problems in energy supply network protection equipment and systems in the electricity supply industry (ESI).It includes determining correct operation of energy supply network protection equipment and systems and providing solutions. It also includes working safely, reading circuit and reticulation diagrams, applying logical problem-solving processes from measurements and completing the necessary documentation.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Industry Specific Cross Discipline
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to solve problems in energy supply network equipment
  • Work health and safety (WHS)/occupational health and safety (OHS) procedures for a given work area are identified, obtained and understood
       
Element: Extent of work to be undertaken is determined from reports and/or discussions with relevant person/s
       
Element: Advice is sought from the work supervisor to ensure the work is coordinated effectively with others
       
Element: Materials required for work are determined in accordance with workplace procedures
       
Element: Tools, equipment and testing devices required to take measurements are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Solve problems in energy supply network equipment
  • WHS/OHS risk control measures and procedures for carrying out the work are followed
       
Element: The need to test or measure live work is determined in accordance with WHS/OHS requirements and, when necessary, conducted in accordance with workplace safety procedures
       
Element: Circuits/machines/plant are isolated, where necessary, in accordance with WHS/OHS requirements and workplace procedures
       
Element: Safety hazards resulting from reports and risk control measures devised and implemented in consultation with appropriate personnel
       
Element: Problem solving of energy network equipment is approached methodically using measured and calculated values of circuit/apparatus parameters
       
Element: Circuit/apparatus components are dismantled, where necessary, and parts stored to protect them against loss or damage
       
Element: Circuits/components are rechecked and their operational status is confirmed
       
Element: Materials/replacement parts required to solve problems are sourced and obtained in accordance with workplace procedures
       
Element: Effectiveness of the repair is tested in accordance with workplace procedures
       
Element: Apparatus is reassembled, tested and prepared for return to service
       
Element: Unplanned events are dealt with safely and with the approval of relevant personnel
       
Element: Problem-solving activities are completed without damage to apparatus, circuits, the surrounding environment or services applying sustainable energy practices
       
Element: Complete and report on problem solving in energy supply network equipment
  • WHS/OHS work completion risk control measures and procedures are followed
       
Element: Reusable, faulty or worn components are tagged and dispatched for repair to maintain adequate spares
       
Element: Maintenance work activities are documented in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) procedures for a given work area are identified, obtained and understood 
 
 
 
 
WHS/OHS risk control measures and procedures for carrying out the work are followed 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS work completion risk control measures and procedures are followed 
 
 

Forms

Assessment Cover Sheet

UETTDRIS67 - Solve problems in energy supply network equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRIS67 - Solve problems in energy supply network equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: