UETTDRIS74 Mapping and Delivery Guide
Develop engineering solutions for energy supply system protection problems
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UETTDRIS74 - Develop engineering solutions for energy supply system protection problems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit covers developing engineering solutions to resolve problems with energy supply system protection. It encompasses working safely; applying extensive knowledge of energy supply system protection operation, protection devices and their application; gathering and analysing data; applying problem-solving techniques and developing and documenting solutions and alternatives.Typical protection problems are those encountered in meeting performance requirements and compliance standards, revising a protection operating parameters and dealing with protection malfunctions.The application of the skills and knowledge described in this unit requires a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Industry Specific Cross Discipline |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to develop engineering solution for energy supply system protection problems |
| |||||||
Element: Established WHS/OHS risk control measures and procedures in preparation for the work are followed | ||||||||
Element: The extent of the protection problem is determined from performance specifications and situation reports and in consultation with relevant personnel | ||||||||
Element: Activities are planned to meet scheduled timelines in consultation with others involved in the work | ||||||||
Element: Effective strategies are formed to ensure solution development and implementation is carried out efficiently | ||||||||
Element: Develop engineering solution for energy supply system protection |
| |||||||
Element: Knowledge of supply system protection arrangements, operation, device characteristics and applications are applied to developing solutions to supply system protection problems | ||||||||
Element: Parameters, specifications and performance requirements in relation to each protection problem are obtained in accordance with established procedures | ||||||||
Element: Approaches to resolving supply system protection problems are analysed to provide most effective solutions | ||||||||
Element: Unplanned events are dealt with safely and effectively consistent with regulatory requirements and enterprise policies | ||||||||
Element: Quality of work is monitored against personal performance agreement and/or established organisational or professional standards | ||||||||
Element: Test, document and implement engineering solution for energy supply system protection problems |
| |||||||
Element: Adopted solutions are documented, including instruction for their implementation that incorporates risk control measure to be followed | ||||||||
Element: Appropriately competent and qualified person/s required to implement solutions to supply system protection problems is coordinated in accordance with regulatory requirements and enterprise policies | ||||||||
Element: Justification for solutions used to solve supply system protection problems is documented for inclusion in work/project development records in accordance with professional standards | ||||||||
Element: Note: A license to practice in the workplace is required for work involving direct access to plant and equipment connected to installation wiring at voltages above 50 V a.c. or 120 V d.c |