Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRIS99 Mapping and Delivery Guide
Test and verify distribution remote area installations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRIS99 - Test and verify distribution remote area installations |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit covers inspection and testing to verify whether a distribution remote area installation is safe and complies with all requirements. It encompasses working safely, visual inspections and mandatory, optional and functional test procedures, identifying non-compliance defects and mandatory reporting requirements.The application of the skills and knowledge described in this unit may require a licence to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Industry Specific Cross Discipline |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to visually inspect, test and verify remote area distribution installation |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for accessing, testing and verification of overhead distribution installations are obtained and confirmed for the purposes of the work to be performed | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures | ||||||||
Element: Relevant work permits are obtained, understood and signed in accordance with workplace procedures | ||||||||
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Specialist test and measurement equipment for testing and verification of overhead distribution installations are obtained, confirmed in working order and calibrated in accordance with workplace procedures | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Traffic management plan is confirmed as being applied in accordance with workplace procedures | ||||||||
Element: Carry out visual inspection, testing and verification of remote area distribution installation |
| |||||||
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Testing and verification of overhead distribution installations are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures | ||||||||
Element: Remote area distribution installations and associated hardware are visually inspected and confirmed as positioned, secured and terminated/connected in accordance with job requirements and workplace procedures | ||||||||
Element: Energised tests and/or measurements, as required to verify remote area distribution installations, are determined in accordance with job requirements and workplace procedures | ||||||||
Element: Remote area distribution installations are checked for suitability and compliance with workplace procedures and relevant electrical network supply industry standards | ||||||||
Element: Remote area distribution installation protection methods and devices are validated as meeting workplace procedures and relevant electrical distribution protection industry standards | ||||||||
Element: Remote area distribution installation switchgear is validated as being appropriately rated and meeting functional requirements of workplace procedures and relevant electrical distribution network protection industry standards | ||||||||
Element: Remote area distribution installations earthing system and multiple earth neutral (MEN) system components are verified as correctly installed and conforming to workplace procedures and relevant electrical distribution network standards | ||||||||
Element: Mandatory testing of the distribution network system phasing, phase rotation, polarity, voltage and neutral conductors is undertaken and conforms to network construction standards | ||||||||
Element: Quality checks of work are undertaken in accordance with workplace procedures | ||||||||
Element: Report inspection and test findings |
| |||||||
Element: Completed work is checked against work plan, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures | ||||||||
Element: WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required | ||||||||
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Non-compliance defects are identified, corrected and/or reported in accordance with workplace procedures | ||||||||
Element: Recommendations for rectifying defects are made in accordance with workplace procedures | ||||||||
Element: Mandatory documentation is completed in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off and electrical equipment (network infrastructure) returned to service in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |