Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRRT24 Mapping and Delivery Guide
Maintain rail traction bonds
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UETTDRRT24 - Maintain rail traction bonds |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to maintain rail traction bonds in the electricity supply industry (ESI).It includes maintaining and repairing temporary and permanent traction bonds, bonding cables and using safe working practices on or about the running line/track. It also includes isolating systems and circuits in accordance with work plans, identifying and implementing traffic management plans, issuing/accepting electrical permits, inspecting and checking equipment and associated hardware are in a safe condition to test and/or return to service, recommissioning tests to ensure integrity of bonding system prior to return to service and updating of system data/maintenance records.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Rail Traction |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for maintenance of traction bonds |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the maintenance of traction bonds are obtained and confirmed for the purposes of the work to be performed | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures | ||||||||
Element: Relevant work permits are obtained, understood and signed in accordance with workplace procedures | ||||||||
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures | ||||||||
Element: Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures | ||||||||
Element: Traffic management plan is identified and implemented in accordance with workplace procedures | ||||||||
Element: Environmental constraints applicable to work are identified and control measures applied | ||||||||
Element: Perform maintenance of traction bonds |
| |||||||
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Systems and circuits are checked, isolated and proved safe to work on in accordance with workplace procedures | ||||||||
Element: Maintenance and repair of traction bonds and bonding cables are completed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures | ||||||||
Element: Cable and surrounds, including rail and other surfaces, are prepared for jointing and terminating in accordance with workplace procedures | ||||||||
Element: Maintenance testing is performed in accordance with the work schedule, job requirements and workplace procedures | ||||||||
Element: Unplanned events are responded to in accordance with workplace procedures | ||||||||
Element: Quality checks of work are undertaken in accordance with workplace procedures | ||||||||
Element: Complete maintenance of traction bonds |
| |||||||
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off and the system that has undergone the maintenance of a traction bond/s is returned to service in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |