Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRRT26 Mapping and Delivery Guide
Maintain overhead rail traction configurations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRRT26 - Maintain overhead rail traction configurations |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to maintain overhead rail traction configurations in the electricity supply industry (ESI).It includes maintaining and repairing overlaps, cross-overs, turnouts and crossings whilst using safe working practices on or about running line/track. It also includes repairing and/or replacing electrical equipment and associated hardware, identifying and implementing traffic management plans, issuing/accepting electrical permits, isolation of systems and circuits, inspection and checks to confirm equipment and associated hardware are in a safe condition to test and/or return to service, re-commissioning tests to ensure the integrity of the traction system prior to return to service and updating of system data and/or maintenance records.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Rail Traction |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to maintain overhead traction configurations |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the maintenance of overhead traction configurations are obtained and confirmed for the purposes of the work to be performed | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures | ||||||||
Element: Relevant work permits are obtained to access rail corridor, understood and signed in accordance with workplace procedures | ||||||||
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Traffic management plan is confirmed as being applied in accordance with workplace procedures | ||||||||
Element: Environmental constraints applicable to work are identified and control measures applied | ||||||||
Element: Perform maintenance of overhead traction configurations |
| |||||||
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Systems and circuits are checked, isolated and proved safe to work on in accordance with workplace procedures | ||||||||
Element: Maintenance of overhead traction configurations is completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures | ||||||||
Element: Electrical equipment and associated hardware are tested in accordance with job requirements and workplace procedures | ||||||||
Element: Maintenance, including repair and/or replacement of overhead traction configurations, is completed in accordance with work schedule, job requirements and workplace procedures | ||||||||
Element: Unplanned events are responded to in accordance with workplace procedures | ||||||||
Element: Quality checks of work are undertaken in accordance with workplace procedures | ||||||||
Element: Complete maintenance of overhead traction configurations |
| |||||||
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off after final inspections and recommissioning checks and the system is energised, tested and returned to service in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |