Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETTDRRT36 Mapping and Delivery Guide
Maintain traction network wiring systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UETTDRRT36 - Maintain traction network wiring systems
Description
Employability Skills
Learning Outcomes and Application This unit covers the maintenance of overhead traction wiring systems to ensure their proper operation, in particular, the correct registration of the contact wire with respect to the current collectors. It includes the undertaking of safe working practices on or about the running line/track and the preparation needed for stringing and profiling, including the isolation of systems and circuits for safe working according to work plans, the diagnosis of faults and the modification and re-adjustment to appropriate standards. It also encompasses the correct positioning of road signs, barriers and/or warning devices, and the procedure of issuing/accepting electrical permits. It also includes the visual and other necessary checks to confirm that equipment and associated hardware have been correctly maintained according to design and are in a safe condition to undertake tests prior to putting into service, and updating of maintenance data, such as as-built drawings and relevant quality assurance documentation.The application of the skills and knowledge described in this unit requires a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Rail Traction
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare/plan to maintain traction network wiring systems
  • Work schedule(s), including drawings, plans, requirements, established procedures and material lists, are received, analysed and confirmed, as necessary, by site inspection
       
Element: Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites
       
Element: Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the maintenance of traction network wiring systems are obtained and confirmed for the purposes of the work to be performed and communicated to relevant personnel
       
Element: Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures
       
Element: Hazards are identified; WHS/OHS risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear, according to established procedures
       
Element: Relevant work permits are obtained to access and perform work according to requirements and/or established procedures
       
Element: Resources, including personnel, equipment, tools and personal protective equipment (PPE), required for the job are obtained and confirmed in working order
       
Element: Relevant personnel at worksite are confirmed current in cardiopulmonary resuscitation (CPR), first aid, other rescue procedures and related work procedures according to requirements
       
Element: Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary
       
Element: Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
       
Element: Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed, where applicable, in accordance with established procedures
       
Element: Rail/road signs, barriers and warning devices are positioned in accordance with requirements
       
Element: Environmental constraints applicable to work are identified and control measures applied
       
Element: Carry out the maintenance of traction network wiring systems
  • WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and followed in accordance with requirements and/or established procedures
       
Element: Lifting, climbing, working aloft, and use of power tools/equipment, techniques and practices are safely followed and currency according to requirements confirmed
       
Element: Systems and circuits are isolated as required, proved safe to work on in accordance with the requirements/permits and established procedures
       
Element: Essential knowledge and associated skills are applied in the safe maintenance of traction network wiring systems to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements
       
Element: Maintenance, including repair and/or replacement of overhead traction wiring systems, including the modification and re-adjustment of overhead traction conductors is carried out in accordance with the work schedule and requirements/established procedures
       
Element: Profiling is completed according to established procedures
       
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions according to established procedures
       
Element: Unplanned events in the maintenance of traction network wiring systems are undertaken within the scope of established procedures
       
Element: Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills
       
Element: Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures
       
Element: Complete the maintenance of traction network wiring systems
  • Work undertaken is checked against design drawings and work schedule for conformance with requirements and anomalies reported in accordance with established procedures
       
Element: Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable
       
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures
       
Element: Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures
       
Element: Relevant work permits are signed off and the overhead traction network wiring system is returned to service in accordance with requirements
       
Element: Work completion records, reports, as installed/modified drawings and/or documentation and information are finalised and processed and appropriate personnel notified
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedule(s), including drawings, plans, requirements, established procedures and material lists, are received, analysed and confirmed, as necessary, by site inspection 
 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and followed in accordance with requirements and/or established procedures 
 
 
 
 
 
 
 
 
 
Work undertaken is checked against design drawings and work schedule for conformance with requirements and anomalies reported in accordance with established procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

UETTDRRT36 - Maintain traction network wiring systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRRT36 - Maintain traction network wiring systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: