Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETTDRRT99 Mapping and Delivery Guide
Test and verify rail traction installations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UETTDRRT99 - Test and verify rail traction installations
Description
Employability Skills
Learning Outcomes and Application This unit covers inspection and testing to verify whether a Rail Traction Installations is safe and complies with all requirements. It encompasses working safely, visual inspections and mandatory, optional and functional test procedures, identifying non-compliance defects and mandatory reporting requirements. The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Rail Traction
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to inspect, test and verify rail traction installations
  • Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed
       
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel
       
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for accessing, testing and verification of rail traction installations are obtained and confirmed for the purposes of the work to be performed
       
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
       
Element: Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
       
Element: Relevant work permits are obtained to access rail corridor, understood and signed in accordance with workplace procedures
       
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
       
Element: Specialist test and measurement equipment for testing and verification of rail traction installations are obtained, inspected, calibrated and confirmed in working order in accordance with workplace procedures
       
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures
       
Element: Traffic management plan is confirmed as being applied in accordance with workplace procedures
       
Element: Carry out visual inspection, test and verification of Rail Traction installation
  • WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
       
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
       
Element: Testing and verification of rail traction installations are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
       
Element: Rail traction installations and associated hardware are visually inspected and confirmed as positioned, secured and terminated/connected in accordance with job requirements and workplace procedures
       
Element: Energised tests and/or measurements, as required, to verify rail traction installations are determined in accordance with WHS/OHS requirements and conducted within workplace safety procedures
       
Element: Rail traction installations are checked for suitability and compliance with organisational construction standards and relevant electrical rail traction network supply standards
       
Element: Rail traction installation protection methods and devices are validated as meeting organisational construction and relevant rail traction network protection standards
       
Element: Rail traction installation switchgear is appropriately rated and validated, meeting functional requirements of organisational construction and relevant distribution network protection standards
       
Element: Rail traction installations earthing system and multiple earth neutral (MEN) system components are installed and compliance verified in accordance with workplace construction procedures and distribution network standards
       
Element: Mandatory tests are conducted to verify rail traction installation is in accordance with workplace procedures
       
Element: Solutions used to solve problems are applied in accordance with workplace procedures
       
Element: Quality checks of work are undertaken in accordance with workplace procedures
       
Element: Report inspection and test findings
  • WHS/OHS risk control work completion measures and procedures are followed
       
Element: Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
       
Element: WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
       
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
       
Element: Non-compliance defects are identified, corrected and/or reported in accordance with workplace procedures
       
Element: Recommendations for rectifying defects are made in accordance with workplace procedures
       
Element: Mandatory documentation is completed in accordance with workplace procedures
       
Element: Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
       
Element: Relevant work permits are signed off and electrical equipment (network infrastructure) returned to service in accordance with workplace procedures
       
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed 
 
 
 
 
 
 
 
 
 
WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control work completion measures and procedures are followed 
 
 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

UETTDRRT99 - Test and verify rail traction installations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRRT99 - Test and verify rail traction installations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: