UETTDRSB23 Mapping and Delivery Guide
Install and maintain substation direct current systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRSB23 - Install and maintain substation direct current systems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install and maintain substation direct current (d.c.) systems in the electricity supply industry (ESI).It includes installing and maintaining substation d.c. systems, such as main batteries, communication batteries, d.c lighting systems, battery chargers, uninterrupted power supply (UPS) systems and associated control circuits in accordance with workplace procedures. It also includes diagnosing faults, replacing faulty equipment, conducting pre-commissioning/recommissioning tests and interpreting test results against agreed specifications.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Substation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan to install and/or maintain substation d.c. systems |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Risk control measures are identified, prioritised, implemented and evaluated against the work schedule | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required | ||||||||
Element: Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Carry out the installation and maintenance of substation d.c. systems |
| |||||||
Element: Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures | ||||||||
Element: Safe working documentation is acquired and requirements completed in accordance with workplace procedures | ||||||||
Element: Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with workplace procedures | ||||||||
Element: Substation d.c. systems are installed safely to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures | ||||||||
Element: Installation of substation d.c. systems is performed in accordance with work schedules, job requirements and workplace procedures | ||||||||
Element: Maintenance of substation d.c. systems is performed in accordance with work schedules, job requirements and workplace procedures | ||||||||
Element: Installation and/or maintenance of substation d.c. systems are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures | ||||||||
Element: Unplanned events or conditions are responded to in accordance with workplace procedures | ||||||||
Element: Substation d.c. systems are performance tested in accordance with workplace procedures and job specifications | ||||||||
Element: Quality checks of work are undertaken in accordance with industry standards and workplace procedures | ||||||||
Element: Complete the installation and maintenance of substation d.c. systems |
| |||||||
Element: Safe working documentation is surrendered and equipment made ready for service in accordance with workplace procedures, if required | ||||||||
Element: Worksite is cleaned and confirmed safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment, surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |