UETTDRSB23 Mapping and Delivery Guide
Install and maintain substation direct current systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UETTDRSB23 - Install and maintain substation direct current systems
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to install and maintain substation direct current (d.c.) systems in the electricity supply industry (ESI).It includes installing and maintaining substation d.c. systems, such as main batteries, communication batteries, d.c lighting systems, battery chargers, uninterrupted power supply (UPS) systems and associated control circuits in accordance with workplace procedures. It also includes diagnosing faults, replacing faulty equipment, conducting pre-commissioning/recommissioning tests and interpreting test results against agreed specifications.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Substation
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan to install and/or maintain substation d.c. systems
  • Work schedules, construction plans, drawings, workplace procedures and material lists are obtained and analysed
       
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel
       
Element: Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
       
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
       
Element: Risk control measures are identified, prioritised, implemented and evaluated against the work schedule
       
Element: Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
       
Element: Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required
       
Element: Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
       
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
       
Element: Carry out the installation and maintenance of substation d.c. systems
  • WHS/OHS, sustainable energy and environmental principles and practices are monitored and actioned to reduce incidents of accidents in accordance with workplace procedures
       
Element: Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures
       
Element: Safe working documentation is acquired and requirements completed in accordance with workplace procedures
       
Element: Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures
       
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with workplace procedures
       
Element: Substation d.c. systems are installed safely to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
       
Element: Installation of substation d.c. systems is performed in accordance with work schedules, job requirements and workplace procedures
       
Element: Maintenance of substation d.c. systems is performed in accordance with work schedules, job requirements and workplace procedures
       
Element: Installation and/or maintenance of substation d.c. systems are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
       
Element: Unplanned events or conditions are responded to in accordance with workplace procedures
       
Element: Substation d.c. systems are performance tested in accordance with workplace procedures and job specifications
       
Element: Quality checks of work are undertaken in accordance with industry standards and workplace procedures
       
Element: Complete the installation and maintenance of substation d.c. systems
  • Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
       
Element: Safe working documentation is surrendered and equipment made ready for service in accordance with workplace procedures, if required
       
Element: Worksite is cleaned and confirmed safe in accordance with workplace procedures
       
Element: Tools, equipment, surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
       
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedules, construction plans, drawings, workplace procedures and material lists are obtained and analysed 
 
 
 
 
 
 
 
 
WHS/OHS, sustainable energy and environmental principles and practices are monitored and actioned to reduce incidents of accidents in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
 
 
Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures 
 
 
 
 

Forms

Assessment Cover Sheet

UETTDRSB23 - Install and maintain substation direct current systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRSB23 - Install and maintain substation direct current systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: