Maintain high voltage power system static VAR compensators (SVC)
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UETTDRSB30 - Maintain high voltage power system static VAR compensators (SVC) |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to maintain high voltage (HV) power system static VAR compensators (SVC) in the electricity supply industry (ESI).It includes diagnosing faults, replacing and repairing HV power system SVC components. It also includes diagnostic and return to service tests and interpreting tests results against agreed specifications.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Substation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan to maintain HV power system SVC |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Risk control measures are identified, prioritised, implemented and evaluated against the work schedule | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required | ||||||||
Element: Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Carry out maintenance on HV power system SVC |
| |||||||
Element: Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures | ||||||||
Element: Safe working documentation is acquired and requirements completed in accordance with workplace procedures | ||||||||
Element: Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with workplace procedures | ||||||||
Element: HV power system SVC are safely maintained and repaired to ensure completion in agreed timeframes, to quality standards and minimum waste in accordance with workplace procedures | ||||||||
Element: Pre-service tests and measurements are conducted in accordance with enterprise procedures | ||||||||
Element: Unplanned events or conditions are responded to in accordance with workplace procedures | ||||||||
Element: Complete the maintenance of HV power system SVC |
| |||||||
Element: Safe working documentation is surrendered and HV power system SVC is made ready for service | ||||||||
Element: Worksite is rehabilitated, cleaned up and confirmed safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment, surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures and relevant personnel notified |