Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRTP11B Mapping and Delivery Guide
Maintain energised lines (transmission) using live line stick technique
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRTP11B - Maintain energised lines (transmission) using live line stick technique |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the maintenance of energised high voltage transmission overhead electrical apparatus, i.e. live line work using line Stick techniques and includes the verification of the site conditions and the potential hazards, the conformation and calculation of physical loads and the selection of appropriate and authorised work method. It includes the preparation and cleaning of specialist material and tools in accordance with authorised technical instructions. It also encompasses the undertaking of OHS and safe working practices and the rendering inoperative of the automatic re-closing device including its restoration in accordance with the work plan and the procedure of issuing/accepting electrical access permits and or relevant work document. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. BSBWOR402A Promote team effectiveness UETTDRIS25B Contribute to coordinated HV live line work UETTDRTP09B Install and maintain electrical conductors and cables (towers) For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare/plan to maintain energised lines (transmission) using live line stick technique |
| |||||||
Element: Carry out the maintenance of energised lines (transmission) using live line stick technique |
| |||||||
Element: Complete the maintenance of energised lines (transmission) using live line stick technique |
|