Install transmission structures and associated hardware
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRTP26 - Install transmission structures and associated hardware |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit covers the erection of non-energised, pyramid, delta, Pi or enterprise specific transmission towers and associated hardware. It includes the erection of components in accordance with construction plans, specifications, work orders and standing enterprise requirements. Erection could also involve cleaning and welding. The updating of system data, records and or completion of relevant documentation in accordance with enterprise requirements also forms part of this competency.The application of the skills and knowledge described in this unit may require a licence to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Transmission |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install transmission structures and associated hardware |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for erecting towers and associated hardware are obtained and confirmed for the purposes of the work to be performed | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures | ||||||||
Element: Relevant work permits are confirmed and signed in accordance with workplace procedures | ||||||||
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Traffic management plan is confirmed as being applied in accordance with workplace procedures | ||||||||
Element: Carry out the erection of transmission towers and associated hardware |
| |||||||
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Transmission structures and associated hardware are assembled at ground level and erected in accordance with construction plans, drawings and workplace procedures | ||||||||
Element: Structure is stabilised in accordance with construction plans, drawings and workplace procedures | ||||||||
Element: Unplanned events are responded to in accordance with workplace procedures | ||||||||
Element: Quality checks of work are undertaken in accordance with workplace procedures | ||||||||
Element: Complete installation of transmission structures and associated hardware |
| |||||||
Element: WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required | ||||||||
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off and towers and associated hardware are returned to service in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |