Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRTP31 Mapping and Delivery Guide
Maintain energised transmission lines using high voltage live work stick method
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRTP31 - Maintain energised transmission lines using high voltage live work stick method |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit covers the maintenance of energised high voltage transmission overhead electrical apparatus, i.e. live line work using line Stick techniques and includes the verification of the site conditions and the potential hazards, the conformation and calculation of physical loads and the selection of appropriate and authorised work method. It includes the preparation and cleaning of specialist material and tools in accordance with authorised technical instructions. It also encompasses the undertaking of work health and safety (WHS)/occupational health and safety (OHS) and safe working practices, and the rendering inoperative of the automatic re-closing device including its restoration, in accordance with the work plan and the procedures of issuing/accepting electrical access permits and or relevant work documents.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Transmission |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan to maintain energised transmission lines using HV live work stick method |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Risk control measures are identified, prioritised and evaluated against the work schedule | ||||||||
Element: Relevant work permits are obtained and signed in accordance with workplace procedures | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Relevant personnel at worksite are confirmed current in first aid, cardiopulmonary resuscitation (CPR) and other rescue procedures in accordance with job requirements and/or workplace procedures | ||||||||
Element: Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to perform work, as required | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures | ||||||||
Element: Traffic management is planned and implemented in accordance with workplace procedures | ||||||||
Element: Carry out the maintenance of energised transmission lines using HV live work stick method |
| |||||||
Element: First aid, CPR and other rescue procedures are performed in accordance with job requirements and/or workplace procedures | ||||||||
Element: Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with established procedures | ||||||||
Element: Auto-reclose devices and associated circuits are rendered inoperative and necessary work documentation obtained in accordance with workplace procedures | ||||||||
Element: Remedial actions are taken to overcome shortfalls encountered in the work schedule in accordance with job requirements and workplace procedures | ||||||||
Element: Maintenance of energised HV overhead electrical transmission apparatus is performed in accordance with work schedules, job requirements and workplace procedures | ||||||||
Element: Energised HV overhead electrical transmission apparatus is maintained to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures | ||||||||
Element: Solutions to non-routine problems are identified and actioned in accordance with workplace procedures | ||||||||
Element: Quality checks of work are undertaken in accordance with industry standards and workplace procedures | ||||||||
Element: Complete the maintenance of energised transmission lines using HV live work stick method |
| |||||||
Element: WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required | ||||||||
Element: Worksite is cleaned and confirmed safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment, surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off and client/customer advised in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |