Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETTDRVC23 Mapping and Delivery Guide
Plan the removal of vegetation up to vegetation exclusion zone near live electrical apparatus

Version 1.0
Issue Date: June 2024


Qualification -
Unit of Competency UETTDRVC23 - Plan the removal of vegetation up to vegetation exclusion zone near live electrical apparatus
Description
Employability Skills
Learning Outcomes and Application This unit covers the preparation for the controlled removal of vegetation near live electrical apparatus up to the live work zone as defined for both authorised and instructed persons in the industry guidelines associated with live electrical apparatus. This includes electrical and communications conductors and cables/powerlines and associated equipment on poles and structures according to requirements and established procedures. It does not include the full gamut of rigging techniques and practices required of a rigger or entry into to the safe approach distance (SAD) as defined for persons, mobile plant, equipment and specialised tools.It includes the preparation of a plan for the control and removal of vegetation, specification of appropriate chemical control methods, use of slinging and loading techniques and practices to be used, traffic management, and appropriate pruning and/or cutting techniques and practices (encompasses cutting plan) for given vegetation species to minimise regrowth within the electrical field according to requirements and procedures. Also included is the preparation of risk assessment control measures that encompass job safety assessment. Encompassed is compliance with relevant state or territory regulatory agencies/bodies, local government legislation, industry bi-partite bodies, guidelines/codes of practices or other related requirements for safe work and access near live electrical and mechanical apparatus.The skills and knowledge described in this unit may only be practiced under the regulations pertaining to each state and territory for the safe planning for the removal of vegetation around live powerlines up to the live work zone, including near live electrical apparatus, and regulations that directly relate to work health and safety (WHS)/occupational health and safety (OHS) and/or contracts of training where they apply.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Vegetation
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for the development of the plan for the removal of vegetation up to vegetation exclusion zone near electrical apparatus
  • Work instructions are received and confirmed
       
Element: Relevant requirements and established procedures to be followed for the development of the work plan are discussed with all personnel to establish and confirm the work schedule
       
Element: WHS/OHS policies and procedures to be followed for the work to be performed are received and confirmed
       
Element: Suggestions to assist in meeting the planning for the removal of vegetation up to the live work zone near live electrical apparatus outcomes are made to others involved in the work
       
Element: Hazards are identified and WHS/OHS risks are identified and reported according to established procedures
       
Element: Scope of responsibility under the relevant work permits/access authorisations are identified and confirmed according to requirements and established procedures with relevant personnel
       
Element: Resources, including, plant, equipment, tools and personal protective equipment (PPE) required for the job are identified in accordance with established procedures
       
Element: Relevant responsibility associated with first aid, aerial rescue, tree-top rescue and/or other related work safety procedures at the worksite are confirmed, where appropriate, in accordance with requirements and established procedures to ensure safety measures are followed in the instance of an incident
       
Element: Client issues are identified and referred to appropriate personnel in accordance with industry/community standards
       
Element: Site preparation requirements are confirmed according to given instructions and planning of the work schedule for a quality outcome and to meet sustainable energy principles and practices to minimise risk and damage to property, commerce, stock and individuals in accordance and established procedures
       
Element: Road signs, barriers and warning device requirements are positioned in accordance with given instructions and requirements are confirmed
       
Element: Carry out the development of the Plan for the removal of vegetation up to vegetation exclusion zone near live electrical apparatus
  • WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are confirmed in accordance with given instructions, requirements and/or established procedures
       
Element: Lifting, climbing, working aloft, and use of power tools/equipment, techniques and practices are confirmed in accordance with given instructions and according to requirements to eliminate the prospects of incidents
       
Element: Operational knowledge for planning the removal of vegetation up to the live work zone near live electrical apparatus to be applied to the work is confirmed to ensure completion will be within an agreed timeframe and to quality standards with a minimum of waste according to requirements and established procedures
       
Element: Plan for the removal of vegetation up to the live work zone near live electrical apparatus is produced in accordance with given instructions and established procedures
       
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are monitored and reported/referred to immediate authorised personnel for directions according to established procedures
       
Element: Non-routine events are referred to immediate authorised personnel for directions according to established procedures
       
Element: Development of the plan is carried out in accordance with the work schedule and to requirements
       
Element: Problems associated with producing the plan for the removal of vegetation up to the live work zone live electrical apparatus are attended to according to acquired known solutions and skills related to routine procedures to ensure the plan is produced in accordance with instructions and established procedures
       
Element: Ongoing checks of quality of the work are undertaken in accordance with given instructions and established procedures
       
Element: Complete development of the plan for the removal of vegetation up to vegetation exclusion zone near electrical apparatus
  • Work undertaken is checked against work schedule and anomalies reported to authorised personnel in accordance with established procedures
       
Element: Potential accidents and/or incidents are identified and reported to authorised personnel in accordance with established procedures
       
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with given instructions and established procedures
       
Element: Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures
       
Element: Appropriate personnel are notified of work completion according to established procedures
       
Element: Work completion records and report forms/data sheets are completed accurately in accordance with given instructions and established procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions are received and confirmed 
 
 
 
 
 
 
 
 
 
 
WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are confirmed in accordance with given instructions, requirements and/or established procedures 
 
 
 
 
 
 
 
 
Work undertaken is checked against work schedule and anomalies reported to authorised personnel in accordance with established procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

UETTDRVC23 - Plan the removal of vegetation up to vegetation exclusion zone near live electrical apparatus
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRVC23 - Plan the removal of vegetation up to vegetation exclusion zone near live electrical apparatus

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: