Application
It requires identification of work requirement, preparation for work, removal of assemblies, installation of engine assemblies and completion of work finalisation processes, including cleaning and documentation. Engines covered in this unit are to be those applicable to the qualification being sought. Work requires individuals to demonstrate discretion, judgement and problem-solving skills in managing own work activities and contributing to a productive team environment. Work is carried out in accordance with award provisions. |
Elements and Performance Criteria
ELEMENT | PERFORMANCE CRITERIA |
1. Prepare to remove engine assemblies | 1.1. Nature and scope of work requirements are identified and confirmed 1.2. OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work 1.3. National Environmental Protection Measure for Diesel Vehicles (Guidelines) is sourced and observed throughout the work 1.4. Procedures and information such as workshop manuals and specifications, and tooling required, are sourced 1.5. Method options are analysed and those most appropriate to the circumstances are selected and prepared 1.6. Technical and/or calibration requirements for removal are sourced and support equipment is identified and prepared 1.7. Warnings in relation to working with lifting and jacking equipment are observed |
2. Carry out the removal of engine assemblies | 2.1. Methods for the removal are implemented in accordance with workplace procedures and manufacturer/component supplier specifications 2.2. Observations are noted during the removal 2.3. Documentation of observations are completed |
3. Install engine assemblies | 3.1. OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work 3.2. Procedures and information required are identified and sourced 3.3. Technical and tool requirements for installation are identified and support equipment is identified and prepared 3.4. Methods for the installation are implemented in accordance with workplace procedures and manufacturer/component supplier specifications 3.5. Tests and adjustments following the installation are in accordance with manufacturer/component supplier specifications |
4. Prepare vehicle/ equipment for use or storage | 4.1. Removal and installation schedule documentation are completed 4.2. Final inspection is made to ensure protective guards, safety features and cowlings are in place 4.3. Final inspection is made to ensure work is to workplace expectations 4.4. Vehicle/equipment is cleaned for use or storage to workplace expectations 4.5. Job card is processed in accordance with workplace procedures |
Required Skills
Required skills |
apply research and interpretive skills sufficient to locate, interpret and apply manufacturer/component supplier procedures, workplace policies and procedures. apply analytical skills required for identification and analysis of technical information apply plain English literacy and communication skills in relation to dealing with customers and team members apply questioning and active listening skills for example when obtaining information from customers apply oral communication skills sufficient to convey information and concepts to customers apply planning and organising skills to own work activities, including making good use of time and resources, sorting out priorities and monitoring one's own performance interact effectively with other persons both on a one-to-one basis and in groups, including understanding and responding to the needs of a customer and working effectively as a member of a team to achieve a shared goal use mathematical ideas and techniques to correctly calculate time, assess tolerances, apply accurate measurements, calculate material requirements and establish quality checks establish safe and effective work processes which anticipate and/or resolve problems and downtime, to systematically develop solutions to avoid or minimise reworking and avoid wastage use workplace technology related to the removal and installation of engine assemblies, including the use of measuring equipment, tooling and equipment, computerised technology and communication devices and the reporting/documenting of results |
Required knowledge |
A working knowledge of: OH&S and environmental regulations/requirements, equipment, material and personal safety requirements dangers of working with lifting and jacking equipment operating principles of vehicles systems and their relationship to each other types and layout of service/repair manuals (hard copy and electronic) engine assembly removal procedures engine assembly installation procedures National Environmental Protection Measures for Diesel Vehicles enterprise quality procedures work organisation and planning processes |
Evidence Required
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. | |
Overview of assessment | |
Critical aspects for assessment and evidence required to demonstrate competency in this unit | It is essential that competence in this unit signifies ability to transfer competence to changing circumstances and to respond to unusual circumstances in the critical aspects of: observing safety procedures and requirements communicating effectively with others involved in or affected by the work selecting methods and techniques appropriate to the circumstances completing preparatory activity in a systematic manner conducting the removal and replacement of a range of engine assemblies in accordance with workplace and manufacturer/component supplier requirements and specifications completing removal and installation of engine and associated components within workplace timeframes equipment is presented to customer in compliance with workplace requirements |
Context of, and specific resources for assessment | Application of competence is to be assessed in the workplace or simulated worksite Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints Assessment is to comply with regulatory requirements, including Australian Standards The following resources should be made available: workplace location or simulated workplace material relevant to removal and installation of engine assemblies equipment, hand and power tooling appropriate to removal and installation of engine assemblies activities covering mandatory task requirements specifications and work instructions |
Method of assessment | Assessment must satisfy the endorsed assessment guidelines of the automotive industry's RS&R Training Package Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies Assessment may be applied under project related conditions and require evidence of process Assessment must confirm a reasonable inference that competence is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances It is preferable that assessment reflects a process rather than an event and occurs over a period of time to cover varying quality circumstances. Evidence of performance may be provided by customers, team leaders/members or other persons subject to agreed authentication arrangements Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role |
Guidance information for assessment |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. | |
Engine assemblies | Engine assemblies may be those in any type of vehicle, equipment or craft |
OH&S | OH&S requirements are to be in accordance with legislation/regulations/codes of practice and enterprise safety policies and procedures. This may include protective clothing and equipment, use of tooling and equipment, workplace environment and safety, handling of material, use of fire fighting equipment, enterprise first aid, hazard control and hazardous materials and substances |
Personal protective equipment | Personal protective equipment is to include that prescribed under legislation/regulations/codes of practice and workplace policies and practices |
Safe operating procedures | Safe operating procedures are to include, but are not limited to the conduct of operational risk assessment and treatments associated with vehicular movement, toxic substances, electrical safety, machinery movement and operation, manual and mechanical lifting and shifting, working in proximity to others and site visitors |
Emergency procedures | Emergency procedures related to this unit are to include, but are not limited to emergency shutdown and stopping of equipment, extinguishing fires, enterprise first aid requirements and site evacuation |
Environmental requirements | Environmental requirements are to include but are not limited to waste management, noise, dust and clean-up management |
Quality requirements | Quality requirements are to include, but are not limited to regulations, including Australian Standards, internal company quality policy and standards and enterprise operations and procedures |
Statutory/regulatory authorities | Statutory/regulatory authorities may include Federal, State/Territory and local authorities administering acts, regulations and codes of practice |
Tooling and equipment | Tooling and equipment may include hand tooling, meters, gauges and lifting, jacking and load testing devices |
Materials | Materials may include spare parts, lubricants and cleaning materials |
Communications | Communications are to include, but are not limited to verbal and visual instructions and fault reporting and may include site specific instructions, written instructions, plans or instructions related to job/task, telephones and pagers |
Information/documents | Sources of information/documents may include: verbal or written and graphical instructions, signage, work schedules/plans/specifications, work bulletins, memos, material safety data sheets, diagrams or sketches safe work procedures related to the removal and installation of engine assemblies regulatory/legislative requirements pertaining to the automotive industry, including Australian Design Rules engineer's design specifications and instructions organisation work specifications and requirements Instructions issued by authorised enterprise or external persons Australian Standards |
Sectors
Unit sector | Technical |
Employability Skills
This unit contains employability skills. |
Licensing Information