- CPCCLRG3001A - Licence to perform rigging basic level
CPCCLRG3001A
Licence to perform rigging basic level
Application
This unit requires the applicant to be able plan the work, select and inspect equipment, set up task, erect structures and plant and dismantle structures and plant. This unit is based upon the National Standard for Licensing Persons Performing High Risk Work. This unit in its current form meets state and territory licensing requirements. Any alteration will result in a unit which is not acceptable to regulators for the purpose of licensing. This unit has a pre-requisite requirement. This requirement may be met by either the successful completion of the unit CPCCLDG3001A Licence to perform dogging or holding a valid licence for dogging. |
Prerequisites
Licence to perform dogging | ||
Elements and Performance Criteria
ELEMENT | PERFORMANCE CRITERIA |
1. Plan job. | 1.1. Task to be undertaken is assessed. 1.2. Potential workplace hazards are identified. 1.3. Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment. 1.4. Site information is obtained. 1.5. All forces and loads associated with erecting and dismantling structures and associated plant are considered in consultation with appropriate personnel. 1.6. Rigging equipment and associated equipment are identified in consultation with appropriate personnel according to procedures and site information. 1.7. Safety equipment is identified. 1.8. Appropriate communication methods are identified with appropriate personnel. |
2. Select and inspect equipment. | 2.1. Rigging equipment and associated equipment are selected and inspected according to procedures and the appropriate standard. 2.2. Safety equipment is selected and inspected according to procedures. 2.3. All defective rigging equipment, associated equipment and safety equipment is isolated, reported and recorded according to procedures. 2.4. Communication equipment is selected and inspected for serviceability (where applicable. |
3. Set up task. | 3.1. Appropriate hazard prevention/control measures are applied to the work area according to procedures. 3.2. Ground suitability is inspected and checked (where appropriate). 3.3. Site information is reviewed, interpreted and communicated to appropriate personnel and appropriate personnel. 3.4. All forces and loads associated with erecting and dismantling structures and associated plant are determined in consultation with appropriate personnel. 3.5. Safety equipment is fitted and worn correctly (where appropriate). 3.6. Rigging equipment and associated plant are positioned for work application and stability according to procedures. 3.7. Methods of applying temporary connections using fibre rope are applied according to procedures and the appropriate standard. |
4. Erect structures and plant. | 4.1. Structures and associated plant are erected according to procedures and site information. 4.2. Stability of structures and associated plant is maintained during erection according to procedures. 4.3. Work is conducted safely at heights including safe and effective use of safety equipment. 4.4. Appropriate communication methods and communication equipment, are used to co-ordinate the tasks. 4.5. Associated plant and rigging equipment is used according to procedures and the appropriate standard. 4.6. Temporary guys, ties, propping and shoring, including flexible steel wire rope, and tubing, are connected where required. 4.7. Associated equipment is used in a safe and appropriate manner. 4.8. The completed task is inspected according to the appropriate standard. 4.9. Excess materials are removed from the work area (where applicable). |
5. Dismantle structures and plant. | 5.1. Structures and associated plant are dismantled according to procedures and the appropriate standard. 5.2. Work is conducted safely at heights including safe and effective use of safety equipment. 5.3. Stability of structures and associated plant is maintained during dismantling according to procedures. 5.4. Rigging equipment, associated equipment, safety equipment and associated plant are inspected for damage and defects. 5.5. All defective rigging equipment, associated equipment, associated plant and safety equipment are isolated reported and recorded according to procedures. 5.6. Rigging equipment and associated equipment are stored. according to procedures and the appropriate standard. 5.7. Hazard prevention/control measures are removed (where appropriate). |
Required Skills
Required skills |
Required skills for this unit are: ability to calculate Safe Working Load (SWL) and Working Load Limit (WLL) ability to erect and dismantle, level, plumb and stabilise associated plant and structures ability to work safely at heights including the correct application of safety equipment. accurate interpretation of basic structural charts and structural plans (site information) applying methods for making temporary connections of ropes using fibre and synthetic types apply methods of splicing and whipping fibre and synthetic ropes correct application and use of all rigging and associated equipment risk assessment and hazard control strategies interpersonal and communication skills at a level sufficient to site/workplace requirements. This includes the relevant communication methods and equipment. verify problems and equipment faults and demonstrate appropriate response. |
Required knowledge |
Required knowledge for this unit is: appropriate mathematical procedures for estimation and measurement of loads ability to interpret manufacturer's specifications for all plant and equipment use in rigging operations knowledge of principles relating to all plant, equipment and structural stability knowledge of the types and functions of rigging, safety and associated equipment including an understanding of their limitations. organisational and workplace standards, requirements, policies and procedures for rigging understanding of the hierarchy of hazard identification and control relevant Commonwealth, state or territory and local government OHS legislation, standards and codes of practice for undertaking rigging activities understanding of inspection and maintenance requirements of a wide range of appropriate plant and equipment in line with Australian Standards or manufacturer's specifications estimation of ground bearing pressures of the full range of soil types and associated ground conditions for setting up plant and equipment. |
Evidence Required
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. | |
Overview of assessment | Successful assessment of this unit meets the competency requirement of the National Standard for licensing Persons Performing High Risk Work. State/Territory OHS regulators have mandated the use of Assessment Instruments and Instructions for Assessment endorsed by the national body responsible for OHS matters for the assessment of this unit. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit | A person who demonstrates competency in this unit must be able to provide evidence of the ability to: comply with OHS licensing legislation. effectively communicate and work safely with others in the work area. effectively conduct risk assessment and management procedures. effectively complete the following tasks:- inspection of all plant and equipment, and installation of a fall arrest system (Static line), and use of a safety harness / fall arrest system, and installation of crane loading platforms and installation of a safety net, and installation of a shutter and safety screen, and demonstrated ability to work safely at heights, and erection of structural steel, and erection of precast panel, and set up and operation of a winch for load movement, and installation of a materials hoist, or installation of a mast climber. effectively demonstrate the following knots, bends and hitches:- Sheet bend, Becket hitch, Running bowline, Double bowline. effectively demonstrate the following splices and whippings:- Eye splice, Back splice, Short splice, Sail makers whipping, Common whipping, West countryman's |
Context of and specific resources for assessment | Assessment of the safe and effective application of knowledge and skill to workplace tasks (performance) must be undertaken using the National OHS endorsed Assessment Instrument. Assessment of performance must be undertaken either in the workplace or in a realistically simulated workplace setting. Assessors must ensure that the assessment in the workplace is organised to ensure that all the required equipment and materials and a suitable working area is made available to suit the assessment and the workplace. Assessment must occur under standard and authorised work practices, safety requirements and environmental constraints. Assessment is to comply with the requirements of any relevant Standards or operating procedures for basic rigging. Applicants must have access to: personal protective equipment (PPE) for the purpose of the Performance Assessment. appropriate safety equipment in safe condition appropriate rigging equipment, associated equipment associated plant in safe condition as described in the endorsed assessment instrument communication equipment (e.g. two-way radios) where applicable appropriate materials as required for safe erection of structures appropriate materials for conducting fibre rope slicing, whipping, knots, bends and hitches. |
Method of assessment | Assessment must be conducted using the national OHS endorsed Assessment Instruments. These Instruments provide advice on their application. The use of 'simulators' in the assessment of this unit of competency is not acceptable. Assessment may be in conjunction with the assessment of other units of competency. Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge. Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstance, but is able to be transferred to other circumstances. |
Guidance information for assessment | Further information about endorsed Assessment Instruments may be obtained from state/territory OHS regulators. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. | |
Hazards may include but are not limited to: | ground stability (e.g. ground condition, recently filled trenches, slopes) overhead hazards (e.g. power lines, service pipes) (NB: minimum clearance distance from powerlines or electrical equipment as determined by relevant state authority or electrical supply authority.) traffic (e.g. pedestrians, vehicles, other plant) insufficient lighting environmental conditions (e.g. wind, lightning, storms) other specific hazards (e.g. dangerous materials). |
Hazard control measures: | Refers to the systematic process of eliminating or reducing the risk to personnel and property through the application of controls. It includes the application of the hierarchy of control, the six-step preference of control measures to manage and control risk: elimination substitution isolation engineering control measures using safe work practices personal protective equipment. |
Appropriate standards may include: | codes of practice legislation Australian Standards manufacturer's specifications industry standards (where applicable). |
Site Information may include, but not limited to: | local conditions such as access and egress, work method statements, site specific job safety analyses and other site specific documentation as required. task plans / Schedules and structural plans. |
Forces and Loads may include, but not limited to: | dead loads live loads static load dynamic loads wind loads. |
Structures may include but are not limited to: | structural steel precast panels. |
Associated plant may include but not limited to: | static lines safety nets hoists mast climbers loading platforms. |
Appropriate personnel may include: | engineers supervisors colleagues managers who are authorised to take responsibility for the workplace or operations. |
Rigging Equipment may include but is not limited to: | scaffolds elevated work platforms personnel box cantilevered crane loading platforms mast climbers. safety screens and shutters cranes including but not limited to: non-slewing cranes mobile slewing cranes vehicle loading cranes tower cranes self-erecting tower cranes portal boom cranes derrick cranes bridge and gantry cranes. |
Associated equipment may include but is not limited to: | all types of power and manually operated lifting gear fibre ropes flexible steel wire rope (FSWR) chains wire and synthetic slings shackles terminations wedge sockets eye bolts beam clamps plate clamps rope grips turnbuckles rigging screws chain blocks lever blocks lever-action winches sheaves spreader bars lifting beams jacks levers skates wedges rollers girder trolley |
Procedures may include but is not limited to: | manufacturer's guidelines (instructions, specifications or checklists) industry operating procedures, relevant codes of practice workplace procedures (work instructions, operating procedures, checklists). |
Safety Equipment may include but not limited to: | safety harness energy absorber lanyard inertia reel static safety lines safety nets. |
Communication Methods may include but is not limited to: | verbal and non-verbal language written instructions signage hand signals listening, questioning to confirm understanding, and appropriate worksite protocol. NB: Mobile phones are not to be used for signalling purposes during the rigging process. |
Communication equipment may include but is not limited to: | fixed channel two-way radios |
Hazard prevention/control measures may include but is not limited to: | safety tags on electrical switches/isolators powerlines are insulated safety observer used inside exclusion zone power disconnected traffic barricades and control pedestrian barricades trench covers movement of obstructions personal protective equipment adequate illumination safety shutters and screens. |
Ground suitability may include but is not limited to: | rough uneven ground backfilled ground soft soils hard compacted soil rock bitumen concrete suspended concrete floors building roofs landings ground bearing pressure. |
Appropriate personnel may include but not limited to | other riggers doggers crane operators. |
Temporary connections may include but not limited to: | knots bends hitches spicing whipping. |
Flexible Steel Wire Rope (FSWR) includes: | identification, uses and connections. May include termination for: static lines, guys, purchase systems, lashing, cranes, hoist and winch ropes. |
Sectors
Unit sector | Construction |
Co-Requisites
Nil | ||
Employability Skills
This unit contains employability skills. |