Application
This unit of competency covers cutting and fitting hard underlay materials prior to laying floor coverings.
Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Elements and Performance Criteria
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. | ||
1 | Prepare for installation | 1.1 | Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installation of hard underlays are verified and complied with |
1.2 | Instructions and/or plans are read and interpreted to identify the process required to complete work tasks | ||
1.3 | Sub-floor condition is assessed for the type of underlay/floor covering to be installed | ||
1.4 | Underlay material suitable to the final surface to be laid is selected | ||
1.5 | Suitable adhesives and fastenings are selected | ||
1.6 | Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition | ||
1.7 | Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation | ||
2 | Set out materials | 2.1 | Hard underlay to be installed is checked against order |
2.2 | Hard underlay is acclimatised according to manufacturer recommendations | ||
2.3 | Working lines and starting point are established | ||
2.4 | Materials are laid out to meet specification requirements and to minimise waste | ||
2.5 | Material is marked and cut to specification with minimum waste | ||
2.6 | Hard underlay is accurately and clearly marked for cutting | ||
2.7 | Hard underlay is cut to required shape with minimum waste of materials | ||
3 | Lay underlay | 3.1 | Instructions and sequence for laying and fixing are followed |
3.2 | Materials for fixing are organised and used in accordance with relevant safety management requirements | ||
3.3 | Fixing methods and equipment are used following manufacturer instructions | ||
3.4 | Completed installation is checked for flaws in installation and materials and faults rectified | ||
4 | Complete housekeeping | 4.1 | Unused materials are stored or recycled as required |
4.2 | Tools and equipment are cleaned and stored appropriately | ||
4.3 | Work area is cleaned and rubbish disposed of appropriately | ||
4.4 | Workplace documentation is completed |
Evidence of Performance
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
Identify materials used in the work process
Follow work instructions, operating procedures and inspection processes to:
minimise the risk of injury to self or others
prevent damage to goods, equipment and products
maintain required production output and product quality
Complete a minimum of:
one (1) installation using hardboard
one (1) installation using fibrous cement board
one (1) installation using MDF/HDF board
one (1) installation using ply flooring/construction flooring
one (1) installation floating substrate underlay
Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements
Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures
Avoid backtracking, work flow interruptions or wastage
Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity
Evidence of Knowledge
State or territory WHS legislation, regulations, standards and codes of practice relevant to installing hard underlays
Organisational and site standards, requirements, policies and procedures for installing hard underlays
Environmental protection requirements
Established communication channels and protocols
Relevant problem identification and resolution
Types of tools and equipment and procedures for their safe use, operation and maintenance
Characteristics of materials, products and defects
Set-up and operation of equipment
Products assembly techniques
Procedures for the recording, reporting and maintenance of workplace records and information
Assessment Conditions
Assessors must:
hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors
have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification
be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.
Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.
Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.
Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.
Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.
Access is required to materials, equipment and specifications relevant to installing hard underlays.
Foundation Skills
Foundation skills essential to performance are explicit in the performance criteria of this unit of competency. Detail on appropriate performance levels for each furnishing unit of competency in reading, writing, oral communication and numeracy utilising the Australian Core Skills Framework (ACSF) are provided in the Furnishing Training Package Implementation Guide.
Range Statement
Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment. | |
Unit context includes: | WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements work requires individual to demonstrate some discretion, judgement and problem solving |
Hard underlays include: | hardboard fibrous cement board medium and high density fibreboard (MDF/HDF) ply flooring (construction sheet flooring) floating substrate flooring |
Adhesives include: | acrylic polyurethane elastomeric |
Tools and equipment include: | hand saw utility knife straight edge pencils square scoring knife hand guillotine hand stapler mallet air compressor and gun explosive tool rotary/hammer drill masonry drill bits bar scriber jig saw circular saw bench saw |
Materials include: | underlay staples nails adhesive nylon fasteners raw plugs screws and tapes |
Personal protective equipment includes: | that prescribed under legislation, regulations and enterprise policies and practices |
Information and procedures include: | workplace procedures relating to the use of tools and equipment work instructions, including job sheets, cutting lists, plans, drawings and designs workplace procedures relating to reporting and communication manufacturer specifications and operational procedures |
Sectors
Flooring technology