Elements and Performance Criteria
ELEMENT | PERFORMANCE CRITERIA | ||
1 Design management plan | 1.1 Review work order and inspection report to confirm task in accordance with company requirements 1.2 Identify hazards and control risks in the work site in accordance with legislative, occupational health and safety (OHS) and company requirements 1.3 Select suitable timber pestmanagement method option(s) for the control of timber pests based on the inspection report and work site environment and in accordance with legislation and company requirements 1.4 Identify, select and apply the most appropriate access and application equipment for implementing the timber pest management plan in accordance with manufacturers' specifications and legislative, OHS and company requirements 1.5 Identify appropriate materials for implementing the timber pest management plan and calculate requirements in accordance with manufacturers' specifications and legislative, OHS and company requirements | ||
2 Prepare to implement timber pest management plan | 2.1 Review timber pest management plan to identify any factors affecting the completion of the work order and clarify any issues with the appropriate person(s) in accordance with company requirements | ||
2.2 Select and use suitable personal protective equipment (PPE) in accordance with manufacturers' specifications and OHS and company requirements 2.3 Select and check operational effectiveness of equipment in accordance with manufacturers' specifications and environmental, legislative, OHS and companyrequirements 2.4 Prepare chemicals and materials in accordance with manufacturers' specifications and environmental, legislative, OHS and company requirements 2.5 Install appropriate signage and barriers as required to maximise public health and safety during the treatment operation | |||
3 Implement management plan | 3.1 Control hazards and control risks in the work site in accordance with legislative, OHS and company requirements 3.2 Install materials as identified in the timber pestmanagement plan in accordance with manufacturers' specifications and environmental, legislative, OHS and company requirements 3.3 Conduct all work using safe operating practices in accordance with manufacturers' specifications and environmental, legislative, OHS and company requirements 3.4 Review implementation to check the effectiveness of the timber pestmanagement plan 3.5 Respond to emergency situations using emergency response procedures in accordance with manufacturers' specifications and environmental, legislative, OHS and company requirements | ||
4 Restore work site | 4.1 Restore work site to condition agreed with client and the requirements of the timber pest management plan in accordance with environmental, legislative, OHS and company requirements | ||
4.2 Eliminate hazards prior to handover in accordance with environmental, legislative, OHS and company requirements 4.3 Remove any signage and barriers used when work site is available for re-use in accordance with work order and OHS and company requirements 4.4 Notify appropriate person(s) of any further hazard reduction or rectification measures necessary in accordance with environmental, legislative, OHS and company requirements | |||
5 Clean, safety-check and store equipment | 5.1 Clean and decontaminate equipment and PPE in accordance with manufacturers' specifications and environmental, OHS and company requirements 5.2 Safety-check equipment and PPE and record any maintenance required in accordance with manufacturers' specifications and OHS and company requirements 5.3 Store cleaned equipment and PPE to allow ready access and re-use in accordance with company requirements 5.4 Transport and store chemicals in accordance with manufacturers' specifications and OHS and company requirements 5.5 Dispose of all collected waste in accordance with work order, manufacturers' specifications and environmental, legislative, OHS and company requirements 5.6 Treat exposed skin to remove any contamination in accordance with manufacturers' specifications and OHS and company requirements | ||
6 Complete documentation | 6.1 Prepare and issue required certificates and notices in accordance with environmental and legislative requirements 6.2 Complete and distribute company documentation in accordance with legislative and company requirements | ||
7 Monitor effectiveness of management plan | 7.1 Establish a periodic contact schedule with the client in accordance with company requirements 7.2 Maintain regular liaison with the client to monitor the effectiveness of the timber pest management plan in accordance with company requirements |
Required Skills
Refer to Evidence Guide
Evidence Required
The evidence guide identifies the requirements to be demonstrated to confirm competence for this unit. Assessment must confirm sufficient ability to use appropriate skills and knowledge to control timber pests. Assessment of performance should be over a period of time covering all categories within the range statement that are applicable in the working environment.
Critical aspects of competency
Accurate identification of the hazards and risks associated with timber pest management.
Compliance with company and legislative/regulatory requirements.
Designing an appropriate timber pest management plan.
Implementing and monitoring a timber pest management plan.
Knowledge of hierarchy of hazard control.
Outcomes achieved in relation to work order.
Selection of appropriate equipment and chemicals.
Knowledge needed to achieve the performance criteria
Knowledge and understanding are essential to apply this unit in the workplace, to transfer the skills to other contexts, and to deal with unplanned events. The knowledge requirements for this unit are listed below.
Types of timber pests relevant to the area and their life cycles, habits and harbourages.
Ecology and biology of timber pests.
Building structures and construction methods.
Soil types.
Pesticidal and physical controls associated with managing timber pests in a range of environments and conditions.
Product knowledge including manufacturers' specifications for equipment and products being used.
OHS legislation and procedures.
Applicable regulations, codes of practice and industry advisory standards.
Routes of entry and potential symptoms of exposure from chemicals.
Knowledge of injury dangerous occurrence and incident reporting.
Emergency response procedures.
Licensing requirements for timber pest management.
Work order specifications.
Company management structure and reporting procedures.
Specific skills needed to achieve the performance criteria
To achieve the performance criteria, some complementary skills are required. These are:
observation
hazard identification and risk control
applying correct manual handling techniques
reading, interpreting and comprehending directions and safety instructions in equipment manuals and MSDS
performing the mathematical calculations required for measuring areas and volumes, the mixing of chemicals and handling of materials as specified on product labels
preparation of regulatory and company documentation and management reports to client
equipment selection and use
recognition of work site variations and uses
working safely at heights and in confined spaces
communicating clearly and concisely using written and verbal modes
requesting advice or further information
seeking and receiving feedback
working on an individual basis and within a team
planning and organising work
sourcing, organising and recording information
customer service.
Prerequisite unit
Competency in unit PRMPM06B Apply pesticide to manage pests, is a prerequisite to competency in this unit.
Other units of competency that could be assessed with this unit
Competence in this unit may be assessed in conjunction with:
PRMPM02B Assess pest management options
PRMPM06B Apply pesticide to manage pests
PRMPM08B Inspect and report on timber pests
PRMPM43A Prepare and present a pest management submission including quotation.
Resources required to assess this unit
The following resources should be available:
access to a suitable work site or venue
access to suitable equipment and materials
access to personal protective equipment
access to relevant databases and information sources
access to company procedures, manufacturers' specifications and MSDS
access to plain English version of relevant statutes and procedures
work order instructions, work plans and schedules, and policy documents
assessment instruments, including personal planner and assessment record book.
Gaining evidence to assess this unit
For valid and reliable assessment of this unit the competency should be demonstrated in the field by reviewing the outcome of at least one complete implementation of a timber pest management plan under normal industry operating conditions or if this is not practicable observations in a realistic simulated work environment.
The competency should be demonstrated over a period of time and observed by the assessor.
The competency is to be demonstrated in a range of situations, which may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Supplementary evidence may be obtained from relevant written correspondence with existing and potential clients. This information must be relevant by showing evidence of the candidate's work performance.
Other forms of gaining evidence such as through oral questioning and hypothetical situations (scenarios) may be used to supplement (but not substitute for) the practical demonstration of competence.
Key competency levels
There are a number of processes that are learnt throughout work and life which are required in all jobs. They are fundamental processes and generally transferable to other work functions. Some of these are covered by the key competencies, although others may be added.
Information below highlights how these processes are applied in this competency standard.
1 | Perform the process | 2 | Perform and administer the process | 3 | Perform, administer and design the process | |||
How can communication of ideas and information be applied? | 2 | Communicate with management and client to ensure all information gathered is appropriate to work order outcomes | ||||||
How can information be collected, analysed and organised? | 2 | Collect previous data and analyse in accordance with all legislation and company requirements. | ||||||
How are activities planned and organised? | 2 | Plan and organise activities in accordance with management method and all relevant legislation and work order. | ||||||
How can teamwork be applied? | 2 | Communicate work order to team members in accordance with OHS, legislative and regulatory requirements and company policy. | ||||||
How can the use of mathematical ideas and techniques be applied? | 2 | Calculate surface area, equipment and material requirements to meet work order requirements. | ||||||
How can problem-solving skills be applied? | 2 | Assess and analyse in conjunction with management and client possible problems which may arise. | ||||||
How can the use of technology be applied? | 2 | Record data, such as incident/hazard reports or other data to meet regulatory requirements. |
Range Statement
The range statement links the required knowledge and organisational and technical requirements to the workplace context. It describes any contextual variables that will be used or encountered when applying the competency in work situations. It allows for different work practices and work and knowledge requirements as well as for differences between organisations and workplaces. The following variables are listed alphabetically and may be present for this particular unit.
Appropriate person(s) may include:
clients
colleagues
managers
person(s) in control of work site(s)
supervisors.
Calculate requirements may apply to:
assessment of physical characteristics
chemical compatibilities
equipment used
flow rates and pressure
nozzle tip selection
recalibration of equipment
surface areas
volumes.
Chemicals may include:
cleaning products
flammable products
pesticides
registered AGVET products.
Clients may include:
body corporate
building supervisor
company/organisation
environmental health officer
executive housekeeper
maintenance manager
owner
person in control of work processes
property agent/manager
tenant.
Company documentation may include:
client records
pest activity/inspection reports
pest management system problem/action reports
service logbooks
site management reports
site visit reports.
Company requirements may include:
access and equity policy, principles and practice
business and performance plans
client communication procedures
client confidentiality procedures
client service standards
communication channels and reporting procedures
company goals, objectives, plans, systems and processes
company issued identification badge/card/pass
company policy and procedures
defined resource parameters
dress and presentation requirements
duty of care, code of conduct, code of ethics
emergency response and evacuation procedures
employer and employee rights and responsibilities
establishing operator identity with client
maintenance procedures for equipment and PPE
OHS control procedures (e.g. health and safety plans, job plans, job safety analysis, risk assessments, safe operating practices/procedures, safe work instructions, work method statements, safe system of work statements)
OHS policies and procedures
personnel practices and guidelines
policies and procedures relating to own role, responsibility and delegation
quality and continuous improvement processes and standards
records and information systems and processes
training (induction and refresher) materials
work site access security clearance procedures.
Control may be:
eradication
exclusion
partial.
Emergency response procedures include:
clean-up
containment
decontamination
documented emergency response procedures
First Aid
isolation
notification of authorities
use of appropriate fire fighting appliances
use of appropriate personal protective equipment
work site/workplace evacuation.
Environmental requirements may include:
clean-up, containment and/or isolation
company policies and guidelines
emergency chemical spill control measures
environmental protection agency and government departments (e.g. agriculture, emergency services and national parks and wildlife) regulations and guidelines
hazardous materials handling
local government regulations/bylaws.
Equipment may include:
borescope
broom
bunding material
camera
dishes or bowls
drills
dusters
electrical extension leads
elevated work platforms
equipment decontamination materials
flexible light
flushing agents
generators
hoses
injectors
knives
ladders
magnifying glass
measuring jug
mirrors
probes
safety harnesses
sand and other absorbent materials
screwdrivers
shovels and rakes
sounding, moisture and movement detectors
specimen bottles
spray equipment
torches
trays
waste disposal containers.
Hazards may include:
allergic reactions to chemicals, pests and/or equipment, including latex allergies
biological and animal waste
bites and stings
blood and blood-stained products
confined/restricted spaces
contaminated clothing, materials and/or equipment
damaged or inappropriate equipment
dust and fibres
electrical hazards arising from cables, electrical fittings (switches and lights) and untested electrical equipment
environmental impact
fatigue
fire
gas
heights
inadequate lighting and ventilation
infectious and zoonotic diseases e.g. scabies/Q fever
leaks, spill, splash and spray
manual handling techniques including awkward and repetitive postures
mobile/vehicle hazards around plant and vehicles
moving and/or unguarded parts
noise
occupational violence and bullying
poor personal hygiene practices
underfoot conditions e.g. slippery, uneven and rough surfaces
work in isolated/remote environments.
Inspection reports may include:
building approvals
previous inspection reports
previous written reports
treatment notices on buildings
warranties.
Legislative requirements may include:
Australian Standards, quality assurance and certification requirements
award and enterprise agreements
industry advisory standards and codes
relevant Commonwealth/state/territory legislation and local government regulations which affect company operation:
anti-discrimination and diversity
building codes
chemical controls
chemical registers/manifests
consumer protection legislation
dangerous goods Acts and regulations
dangerous goods code
declared pest (plant and animal) reporting
environmental protection issues
equal employment opportunity
freedom of information
industrial relations
motor and commercial vehicle(s) transportation
motor licence and endorsement regulations
OHS Acts and regulations
privacy
public health
trade practices
workplace consultative arrangements.
Manufacturers' specifications may include:
emergency response resources
equipment operational manuals
government publications
instructional guides
material safety data sheets (MSDS)
other resources supplied by the manufacturer (such as laminated cards, notices and wall posters) in work sites or vehicles
product labels
safety instructions pre-printed on equipment.
Materials may include:
building components
cleaning products
flammable products
pesticides
physical barriers
registered AGVET products
sealing components.
Occupational health and safety* (OHS) requirements may relate to:
allergic reactions (contact dermatitis, etc)
animal management/control procedures
communication devices for remote and isolated locations e.g. mobile phone, two-way radio, etc
dermatoxicological control and prevention measures
emergency procedures for eye and skin contact, inhalation and ingestion of toxic substances
hazard identification and risk assessment mechanisms
hierarchy of hazard control procedures
industry advisory standards
information provided by national registration authority for chemical approval and state government authorities e.g. agriculture, environment protection, health and primary industry
injury and dangerous occurrence reporting
national and industry codes of practice
OHS control procedures (e.g. health and safety plans, job plans, job safety analysis, risk assessments, safe operating practices/procedures, safe work instructions, work method statements, safe system of work statements)
health surveillance and monitoring (e.g. regular blood testing)
routes of entry and potential symptoms of exposure from chemicals
safe work practices for equipment, PPE and chemical storage including interpretation of MSDS and hazardous substance information e.g. long latency periods
safety training, induction and refresher training
selection and use of PPE and clothing appropriate to the hazard
up-to-date electrical test and tag compliance.
* Also known as workplace health and safety
Personal protective equipment (PPE) may include:
air-line and self-contained respirators
breathing respirator - full-face and half-face
chemical impervious gloves
chemical resistant aprons
communication equipment
contaminated clothing bag
cradles
drinking fluids
dust masks
eye protection e.g. safety glasses, goggles
eyewashes and showers
face shield (splash-proof)
First Aid kit appropriate to the task and location
hair nets
hard hats
high-visibility vests/clothing
long pants
noise protection
non-slip safety shoes/boots
overalls, coveralls or other chemical protective clothing
prodding/probing sticks and rods
safety harness
sharps containers
soap and towel
sunscreen
tongs
torch
washable sun hats
wet-work protective clothing.
Public health and safety may affect:
animals
bystanders
client staff
company staff
customers (present and future)
distributors
facility users
fellow workers (colleagues)
general public
inspectors
neighbours
retailers
suppliers
trade and service providers.
Signage and barriers may include:
physical barriers and restraints erected to restrict access to the work site
signs complying with legislative requirements and/or Australian Standards warning of danger and/or adverse conditions
used/contaminated personal protective equipment e.g. disposable gloves.
Timber pest management method options may include:
biological controls
chemical and physical barrier treatments
cultural controls
environmental controls
management controls.
Timber pest management plan may include:
advice of health, safety, legislative and environmental matters
advice on prevention strategies
chemical application methods
details of timber pest and timber pest activity
follow up pest management advice, monitoring and call-back schedule
timber pest management method options
types and quantities of chemicals to be used.
Timber pests may include:
borers
carpenter ants
termites
wood decay fungi.
Waste may be solid or liquid and include:
contaminated/hazardous biological waste
used containers
used/contaminated personal protective equipment e.g. disposable gloves.
Work order information may include:
access to work site including timing of access and access and egress points
budget allocations
completion times/dates
job requirements and tasks
legislative and local government requirements
OHS requirements and emergency response procedures
resource requirements - equipment and materials
specific client requirements e.g. noise control, sensitivity of occupants to pests and/or management, relationships with other customer activities, dress and presentation requirements
use of signage and barriers
work schedules
work site contact person(s)
working in isolated and remote locations.
Work site environment may include:
age of timber structure
associated building or land uses
dark and humid areas
drainage
geographic location
known pressure pest areas
level of moisture
previous treatments
soil type
timber type
ventilation.
Work sites may include:
building surroundings
buildings
domestic, commercial or industrial premises.
Sectors
Not Applicable
Employability Skills
Not Applicable
Licensing Information
Not Applicable