Application
This unit is appropriate for those working in an assistant technician role at worksites within:
Coal mining
Prerequisites
Not applicable.
Elements and Performance Criteria
ELEMENT | PERFORMANCE CRITERIA |
1. Prepare for plant operations | 1.1. Access, interpret and apply compliance documentation relevant to the work activity 1.2. Locate and identify by name, number and/or code and function all appropriate process equipment and plant 1.3. Carry out pre-start check of all equipment and provide reports to control in accordance with manufacturer and/or site procedures 1.4. Interpret and apply basic mineralogy information required to complete the processes in accordance with site requirements |
2. Monitor preparation plant processes | 2.1. Identify the limitations and capabilities of plant processes and report detail to control 2.2. Monitor plant processes and pass reports to control 2.3. Monitor the operation of equipment and the use of materials and pass reports to control 2.4. Report and record all information required to maintain coal preparation plant processes in accordance with site procedures |
3. Support coal preparation processes | 3.1. Note the results of continuous inspections and identify and locate all faults by name, number and/or code and rectify and/or report in accordance with site procedures 3.2. Complete housekeeping duties throughout the worksites 3.3. Carry out operational reporting and complete and process documents in accordance with site requirements |
Required Skills
Required skills |
Specific skills are required to achieve the performance criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following as required to monitor coal preparation plant operations: apply legislative, organisation and site requirements and procedures for monitoring coal preparation plant operations apply operational safety requirements access, read, interpret and apply technical information identify process equipment and plant apply hand-eye coordination diagnose faults apply preventative control measures use relevant hand tools prepare and communicate reports maintain equipment records comply with environmental requirements enter basic computer data |
Required knowledge |
Specific knowledge is required to achieve the performance criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following as required to monitor coal preparation plant operations: site and equipment/plant safety requirements coal preparation processes manual process control techniques equipment/plant characteristics, technical capabilities and limitations equipment/plant operating procedures basic mineralogy related to coal quality basic geological and survey data relevant chemicals, materials and their environment effects Hazchem related to the work area site environmental requirements and constraints related to coal plant operations recording and reporting procedures impact of processes on customer quality requirements |
Evidence Required
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. | |
Overview of assessment | |
Critical aspects for assessment and evidence required to demonstrate competency in this unit | The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following: knowledge of the requirements, procedures and instructions for the monitoring of coal preparation plant operations implementation of requirements, procedures and techniques for the safe, effective and efficient completion of coal preparation plant operations monitoring working with others to undertake and complete the monitoring of coal preparation plant operations in a way that meets all of the required outcomes consistent timely completion of coal preparation plant operations monitoring that safely, effectively and efficiently meets the required outcomes |
Context of and specific resources for assessment | This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills. Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances. The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job. Customisation of assessment and delivery environment to sensitively accommodate cultural diversity. Aboriginal people and other people from a non English speaking background may have second language issues. Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required. |
Method of assessment | This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods: written and/or oral assessment of the candidate's required knowledge observed, documented and/or first hand testimonial evidence of the candidate's: implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes consistent achievement of required outcomes first hand testimonial evidence of the candidate's: working with others to undertake and complete the monitoring of coal preparation plant operations |
Guidance information for assessment | Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. | |
Relevant compliance documentation may include: | legislative, organisational and site requirements and procedures manufacturer's guidelines and specifications Australian standards Employment and Workplace Relations legislation Equal Employment Opportunity and Disability Discrimination legislation |
Types of coal may include: | seam calorific value size moisture content percentage ash sulphur content coking steam |
Work requirements may include: | shift briefings handover details work orders consideration of the previous shift report end product specifications production results, including tonnages and output tonnages set points for densities levels pressures breakdown details availability and location of coal by type seam blend defects, including faults in plant/equipment maintenance requirement water availability charts print-outs logs amp readings thickener tailings roll stocks |
Safety information and procedures may be contained in: | legislation and regulations relevant Australian standards management plans OHS policy code of practice manufacturer's instructions safe working procedures (or equivalent) |
Process equipment and plant may include: | crushers stackers feeders reclaimers drums samplers conveyors pumps and screens sieve bends chutes launders gates compressors magnetic separators filters centrifuge flotation cells agitators elevator thickeners blowers breakers magnets belts feeders jigs cyclones |
Processes to be controlled may include: | sampling crushing screening jigging flotation magnetite recovery dense media separation fines recovery centrifuging settling and structuring effluent treatment |
Monitoring may include: | ash level moisture content size yield plant availability product stock pile bin capacity reject percentages sump levels density control |
Recording and reporting may include: | control room log computer reports accident/incident reports check sheets pre-shift equipment reports defect reports tags work orders |
Shift reports may include: | plant downages downtime maintenance requirements quality information |
Information may be transmitted by: | 2-way radio telephone PA verbal CB written computer monitor printouts |
Faults may be identified by: | alarms indicator lights amp gauges computer monitor camera monitor visual inspection |
Sectors
Coal Mining (Coal Preparation)
Competency Field
Refer to Unit Sector(s).
Co-Requisites
Not applicable.
Employability Skills
This unit contains employability skills.
Licensing Information
Refer to Unit Descriptor.