Application
This unit involves the skills and knowledge required to install and maintain de-energised low voltage (LV) underground polymeric cables in the electricity supply industry (ESI). It includes jointing, terminating, repairing and replacing cables using a range of equipment, tools and materials. It also includes the isolation of systems and circuits, issuing/accepting electrical access permits, undertaking pre-commissioning and/or re-commissioning tests and updating system data/maintenance records. The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace. Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. |
Elements and Performance Criteria
ELEMENTS | PERFORMANCE CRITERIA | ||
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. | ||
1 | Prepare to install and maintain de-energised LV underground polymeric cables | 1.1 | Work plan, construction plans, drawings, workplace procedures and material lists are received, confirmed and communicated with relevant personnel |
1.2 | Job requirements and workplace procedures are identified and communicated with relevant personnel | ||
1.3 | Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and maintenance of de-energised LV underground polymeric cables are obtained and confirmed for the purposes of the work to be performed | ||
1.4 | Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||
1.5 | WHS/OHS and environmental hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures | ||
1.6 | Relevant work permits are confirmed and signed in accordance with workplace procedures | ||
1.7 | Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||
1.8 | Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||
1.9 | Traffic management plan is confirmed as being applied in accordance with workplace procedures | ||
2 | Carry out the installation and maintenance of de-energised LV underground polymeric cables | 2.1 | WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures |
2.2 | Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||
2.3 | Systems and circuits are isolated as required, proved safe to work on in accordance with workplace procedures | ||
2.4 | De-energised LV underground polymeric cables are installed in accordance with the work schedule and workplace procedures | ||
2.5 | Maintenance, including repair and/or replacement of de-energised LV underground polymeric cables is carried out in accordance with the work schedule and workplace procedures | ||
2.6 | Unplanned events are responded to in accordance with workplace procedures | ||
2.7 | Quality checks of work are undertaken in accordance with workplace procedures | ||
3 | Complete installation and maintenance of de-energised LV underground polymeric cables | 3.1 | Completed work is checked against work plan, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures |
3.2 | WHS/OHS and environmental incidents are reported in accordance with workplace procedures as required | ||
3.3 | Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||
3.4 | Tools, equipment and surplus resources are, where appropriate, are cleaned, checked and returned to storage in accordance with workplace procedures | ||
3.5 | Relevant work permits are signed off and LV underground polymeric cables are returned to service in accordance with workplace procedures | ||
3.6 | Work records, reports and/or documentation are completed in accordance with workplace procedures |
Foundation Skills
Foundation skills essential to performance are explicit in the performance criteria of this unit of competency. |
Range Statement
Range is restricted to essential operating conditions and any other variables essential to the work environment. Non-essential conditions may be found in the Companion Volume Implementation Guide. |
Sectors
Not applicable. |
Competency Field
Cable Jointing |