UETTDRIS53
Install and maintain power system public lighting


Application

This unit covers the installation, maintenance and repair of public lighting systems. IT includes the inspection, testing and commissioning of the system associated with the street lighting circuit, the associated hardware and the earthing system.

Installation will include the installation of associated hardware and components, and the wiring and earthing system. Maintenance also includes work on energised low voltage (LV) overhead or underground public lighting systems, including the diagnosis of faults and the updating of relevant system data and/or public lighting maintenance records.

The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.

Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation and maintenance of public lighting systems

1.1

Works schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed

1.2

Job requirements and workplace procedures are identified and communicated with relevant personnel

1.3

Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for installation and maintenance of public lighting systems are obtained and confirmed for the purposes of the work to be performed

1.4

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures

1.5

Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures

1.6

Relevant work permits are obtained, understood and signed in accordance with workplace procedures

1.7

Plant, equipment, tools and personal protective equipment (PPE) required for work is identified, obtained and confirmed in working order

1.8

Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures

1.9

Traffic management plan is confirmed as being applied in accordance with workplace procedures

2

Carry out installation and maintenance of public lighting systems

2.1

WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures

2.2

Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures

2.3

Installation and maintenance of public lighting systems is completed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures

2.4

Excavation/foundation construction is inspected in accordance with workplace procedures

2.5

Associated hardware, fittings and control equipment are installed in accordance with workplace procedures

2.6

Earthing systems and street lighting circuits are installed in accordance with workplace procedures

2.7

Inspection of public lighting and associated hardware is performed in accordance with workplace procedures

2.8

Maintenance, repair and/or replacement of public lighting systems are performed in accordance with job schedule and workplace procedures

2.9

Unplanned events are responded to in accordance with workplace procedures

2.10

Quality checks of work are undertaken in accordance with workplace procedures

3

Complete installation and maintenance of public lighting systems

3.1

Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures

3.2

WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required

3.3

Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures

3.4

Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures

3.5

Relevant work permits are signed off and the public lighting system is returned to service in accordance with workplace procedures

3.6

Work records, reports and/or documentation are completed in accordance with workplace procedures

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.


Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.


Sectors

Not applicable.


Competency Field

Industry Specific Cross Discipline