UETTDRRT21
Install traction overhead wiring systems


Application

This unit involves the skills and knowledge required to maintain traction overhead wiring systems in the electricity supply industry (ESI).

It includes maintaining and repairing overhead traction wiring systems on or about the running line/track, preparing for stringing and profiling including isolating systems and circuits for safe working. It also includes diagnosing faults, modifying and adjusting to appropriate standards, identifying and implementing road/rail management plans, issuing/accepting electrical permits, recommissioning tests to ensure integrity of traction system prior to returning to service and updating system data and/or maintenance records.

The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.

Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to install overhead traction wiring systems

1.1

Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed

1.2

Job requirements and workplace procedures are identified and communicated with relevant personnel

1.3

Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation of overhead traction wiring systems are obtained and confirmed for the purposes of the work to be performed

1.4

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures

1.5

Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures

1.6

Relevant work permits are obtained to access rail corridor and signed in accordance with workplace procedures

1.7

Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order

1.8

Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures

1.9

Road/rail management plan is identified and implemented in accordance with workplace procedures

1.10

Environmental constraints applicable to work are identified and control measures applied

2

Installation of overhead traction wiring systems

2.1

WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures

2.2

Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures

2.3

Systems and circuits are checked and isolated and proved safe to work and in accordance with job requirements, work permits and workplace procedures

2.4

Installation of overhead traction wiring systems is completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures

2.5

Overhead traction wiring systems, including cables, fittings, traction conductors and associated equipment, are installed in accordance with work schedule, job requirements and workplace procedures

2.6

Profiling is completed in accordance with workplace procedures

2.7

Unplanned events are responded to in accordance with workplace procedures

2.8

Quality checks of work are undertaken in accordance with workplace procedures

3

Complete installation of overhead traction wiring systems

3.1

Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures

3.2

WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required

3.3

Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures

3.4

Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures

3.5

Relevant work permits are signed off and the overhead traction wiring system is returned to service in accordance with workplace procedures

3.6

Work records, reports and/or documentation are completed in accordance with workplace procedures

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.


Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.


Sectors

Not applicable.


Competency Field

Rail Traction