UETTDRRT25
Install overhead rail traction configurations


Application

This unit involves the skills and knowledge required to install overhead rail traction configurations in the electricity supply industry (ESI).

It includes installation of overlaps, cross-overs, turnouts and crossing configurations by using safe working practices on or about the running line/track. It also includes isolating systems and circuits, identifying and implementing traffic management plans, issuing/accepting electrical permits inspection and checks to confirm equipment and associated hardware have been correctly installed in a safe condition to test prior to putting into service, pre-commissioning tests and updating installation data and relevant quality assurance documentation.

The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.

Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation of overhead traction configurations

1.1

Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed

1.2

Job requirements and workplace procedures are identified and communicated with relevant

1.3

Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation of overhead traction configurations are obtained and confirmed for the purposes of the work to be performed

1.4

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures

1.5

Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures

1.6

Relevant work permits are confirmed and signed in accordance with workplace procedures

1.7

Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order

1.8

Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures

1.9

Traffic management plan is confirmed as being applied in accordance with workplace procedures

1.10

Environmental constraints applicable to work are identified and control measures applied

2

Perform installation of overhead traction configurations

2.1

WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures

2.2

Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures

2.3

Systems and circuits are checked, isolated and proved safe in accordance workplace procedures

2.4

Installation of overhead traction configurations are completed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures

2.5

Electrical equipment and associated hardware are positioned, secured and terminated/connected in accordance with job requirements and workplace procedures

2.6

Overhead traction configurations are installed in accordance with job requirements and workplace procedures

2.7

Unplanned events are responded to in accordance with workplace procedures

2.8

Quality checks of work are undertaken in accordance with workplace procedures

3

Complete installation of overhead traction configurations

3.1

Completed work is checked against works schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures

3.2

Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures

3.3

Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures

3.4

Relevant work permits are signed off after final inspections and the system is energised, tested and returned to service in accordance with workplace procedures

3.5

Work records, reports and/or documentation are completed in accordance with workplace procedures

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.


Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.


Sectors

Not applicable.


Competency Field

Rail Traction