UETTDRRT34
Install and maintain traction network wiring systems


Application

This unit covers the installation and maintenance of overhead traction wiring systems to ensure proper installation, in particular, the correct registration of the contact wire with respect to the current collectors.

It includes the undertaking of safe working practices on or about the running line/track and the preparation needed for stringing and profiling, including the isolation of systems and circuits for safe working according to work plans, the diagnosis of faults and the modification and re-adjustment to appropriate standards.

It also encompasses the correct positioning of road signs, barriers and/or warning devices, and the procedure of issuing/accepting electrical permits. It also includes the visual and other necessary checks to confirm that equipment and associated hardware have been correctly installed according to design and are in a safe condition to undertake pre-commissioning tests prior to putting into service and updating installation and maintenance data, such as as-built drawings and relevant quality assurance documentation.

The application of the skills and knowledge described in this unit requires a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work.

Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare/plan to install and maintain traction network wiring systems

1.1

Work schedules, including drawings, plans, requirements, established procedures and material lists, are received, analysed and confirmed, as necessary, by site inspection

1.2

Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites

1.3

Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the installation and maintenance of traction network wiring systems are obtained and confirmed for the purposes of the work to be performed and communicated to relevant personnel

1.4

Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures

1.5

Hazards are identified, WHS/OHS risks assessed and control measures are prioritised, implemented and monitored, including emergency exits kept clear, according to established procedures

1.6

Relevant work permits are obtained to access and perform work according to requirements and/or established procedures

1.7

Resources, including personnel, equipment, tools and personal protective equipment (PPE), required for the job are obtained and confirmed in working order

1.8

Relevant personnel at worksite are confirmed current in cardiopulmonary resuscitation (CPR), first aid, other rescue procedures and related work procedures according to requirements

1.9

Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary

1.10

Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures

1.11

Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed, where applicable, in accordance with established procedures

1.12

Rail/road signs, barriers and warning devices are positioned in accordance with requirements

1.13

Environmental constraints applicable to work are identified and control measures applied

2

Carry out the installation and maintenance of traction network wiring systems

2.1

WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and followed in accordance with requirements and/or established procedures

2.2

Lifting, climbing, working aloft, and use of power tools/equipment, techniques and practices are safely followed and currency according to requirements confirmed

2.3

Systems and circuits are isolated, as required, proved safe to work on in accordance with the requirements/permits and established procedures

2.4

Essential knowledge and associated skills are applied in the safe installation and maintenance of traction network wiring systems to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements

2.5

Overhead traction wiring systems, including cables, fittings, traction conductors and associated equipment, are installed according to design, work schedule requirements and established procedures

2.6

Maintenance, including repair and/or replacement of overhead traction wiring systems, including the modification and re-adjustment of overhead traction conductors is carried out in accordance with the work schedule and requirements/established procedures

2.7

Profiling is completed according to established procedures

2.8

Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions according to established procedures

2.9

Unplanned events in the installation and maintenance of traction network wiring systems are undertaken within the scope of established procedures

2.10

Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills

2.11

Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures

3

Complete the installation and maintenance of traction network wiring systems

3.1

Work undertaken is checked against design drawings and work schedule for conformance with requirements and anomalies reported in accordance with established procedures

3.2

Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable

3.3

Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures

3.4

Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures

3.5

Relevant work permits are signed off and the overhead traction network wiring system is returned to service in accordance with requirements

3.6

Works completion records, reports, as installed/modified drawings and/or documentation and information are finalised and processed and appropriate personnel notified

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.


Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.


Sectors

Not applicable.


Competency Field

Rail Traction