NTISthis.com

Evidence Guide: AHCDRG401 - Coordinate and supervise installation of an irrigation drainage system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCDRG401 - Coordinate and supervise installation of an irrigation drainage system

What evidence can you provide to prove your understanding of each of the following citeria?

Develop and implement construction procedures

  1. Develop employment and contract management procedures
  2. Develop procedures for controlling and recording site deliveries
  3. Develop procedures for recording the hire of plant and equipment
  4. Determine work health and safety procedures, including risk assessment
  5. Notify client, authorities and agencies of the schedule of works
  6. Develop procedures for dealing with environmental issues associated with construction work
Develop employment and contract management procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop procedures for controlling and recording site deliveries

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop procedures for recording the hire of plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine work health and safety procedures, including risk assessment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify client, authorities and agencies of the schedule of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop procedures for dealing with environmental issues associated with construction work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise resource requirements

  1. Nominate tasks and timelines, including the required resources for each
  2. Organise labour requirements
  3. Verify the correct parts and equipment have been delivered to the site and checked
  4. Select and maintain equipment and machinery
  5. Allocate jobs and tasks to the work team
  6. Carry out safety induction for the task and site
Nominate tasks and timelines, including the required resources for each

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise labour requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify the correct parts and equipment have been delivered to the site and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and maintain equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Allocate jobs and tasks to the work team

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out safety induction for the task and site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interpret the irrigation drainage system design for the site

  1. Determine the purpose, scale and required output of the irrigation system
  2. Assess the landscape of the site
  3. Determine construction requirements and verify with the designer
  4. Select components to meet design specifications and site requirements
Determine the purpose, scale and required output of the irrigation system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess the landscape of the site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine construction requirements and verify with the designer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select components to meet design specifications and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise preparatory work

  1. Interpret plan and supervise preparatory work
  2. Take levels and plan earth works
  3. Confirm site is cleaned and marked out
  4. Confirm drainage structures are pegged out
Interpret plan and supervise preparatory work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take levels and plan earth works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm site is cleaned and marked out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm drainage structures are pegged out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise construction of the drainage system

  1. Interpret plan and supervise construction work
  2. Confirm trenches are excavated to specification
  3. Confirm earth works are carried out appropriately
  4. Confirm construction of drainage structures are to specifications
  5. Inspect the lay out and joining of pipes
  6. Check the fitting and adjustment of fittings and valves and confirm all joints are secured
  7. Supervise the installation and testing of the pumping system
Interpret plan and supervise construction work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm trenches are excavated to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm earth works are carried out appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm construction of drainage structures are to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect the lay out and joining of pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the fitting and adjustment of fittings and valves and confirm all joints are secured

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise the installation and testing of the pumping system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission the irrigation drainage system

  1. Start the system up
  2. Identify operating faults and take corrective actions as required
  3. Use testing and monitoring equipment to monitor system efficacy
  4. Make adjustments as required
Start the system up

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify operating faults and take corrective actions as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use testing and monitoring equipment to monitor system efficacy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make adjustments as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise the rehabilitation of the works area

  1. Monitor the resurfacing and sealing earthworks
  2. Confirm the planting and maintenance of vegetation areas have been carried out
  3. Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner
Monitor the resurfacing and sealing earthworks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm the planting and maintenance of vegetation areas have been carried out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop and implement construction procedures

1.1 Develop employment and contract management procedures

1.2 Develop procedures for controlling and recording site deliveries

1.3 Develop procedures for recording the hire of plant and equipment

1.4 Determine work health and safety procedures, including risk assessment

1.5 Notify client, authorities and agencies of the schedule of works

1.6 Develop procedures for dealing with environmental issues associated with construction work

2. Organise resource requirements

2.1 Nominate tasks and timelines, including the required resources for each

2.2 Organise labour requirements

2.3 Verify the correct parts and equipment have been delivered to the site and checked

2.4 Select and maintain equipment and machinery

2.5 Allocate jobs and tasks to the work team

2.6 Carry out safety induction for the task and site

3. Interpret the irrigation drainage system design for the site

3.1 Determine the purpose, scale and required output of the irrigation system

3.2 Assess the landscape of the site

3.3 Determine construction requirements and verify with the designer

3.4 Select components to meet design specifications and site requirements

4. Supervise preparatory work

4.1 Interpret plan and supervise preparatory work

4.2 Take levels and plan earth works

4.3 Confirm site is cleaned and marked out

4.4 Confirm drainage structures are pegged out

5. Supervise construction of the drainage system

5.1 Interpret plan and supervise construction work

5.2 Confirm trenches are excavated to specification

5.3 Confirm earth works are carried out appropriately

5.4 Confirm construction of drainage structures are to specifications

5.5 Inspect the lay out and joining of pipes

5.6 Check the fitting and adjustment of fittings and valves and confirm all joints are secured

5.7 Supervise the installation and testing of the pumping system

6. Commission the irrigation drainage system

6.1 Start the system up

6.2 Identify operating faults and take corrective actions as required

6.3 Use testing and monitoring equipment to monitor system efficacy

6.4 Make adjustments as required

7. Supervise the rehabilitation of the works area

7.1 Monitor the resurfacing and sealing earthworks

7.2 Confirm the planting and maintenance of vegetation areas have been carried out

7.3 Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop and implement construction procedures

1.1 Develop employment and contract management procedures

1.2 Develop procedures for controlling and recording site deliveries

1.3 Develop procedures for recording the hire of plant and equipment

1.4 Determine work health and safety procedures, including risk assessment

1.5 Notify client, authorities and agencies of the schedule of works

1.6 Develop procedures for dealing with environmental issues associated with construction work

2. Organise resource requirements

2.1 Nominate tasks and timelines, including the required resources for each

2.2 Organise labour requirements

2.3 Verify the correct parts and equipment have been delivered to the site and checked

2.4 Select and maintain equipment and machinery

2.5 Allocate jobs and tasks to the work team

2.6 Carry out safety induction for the task and site

3. Interpret the irrigation drainage system design for the site

3.1 Determine the purpose, scale and required output of the irrigation system

3.2 Assess the landscape of the site

3.3 Determine construction requirements and verify with the designer

3.4 Select components to meet design specifications and site requirements

4. Supervise preparatory work

4.1 Interpret plan and supervise preparatory work

4.2 Take levels and plan earth works

4.3 Confirm site is cleaned and marked out

4.4 Confirm drainage structures are pegged out

5. Supervise construction of the drainage system

5.1 Interpret plan and supervise construction work

5.2 Confirm trenches are excavated to specification

5.3 Confirm earth works are carried out appropriately

5.4 Confirm construction of drainage structures are to specifications

5.5 Inspect the lay out and joining of pipes

5.6 Check the fitting and adjustment of fittings and valves and confirm all joints are secured

5.7 Supervise the installation and testing of the pumping system

6. Commission the irrigation drainage system

6.1 Start the system up

6.2 Identify operating faults and take corrective actions as required

6.3 Use testing and monitoring equipment to monitor system efficacy

6.4 Make adjustments as required

7. Supervise the rehabilitation of the works area

7.1 Monitor the resurfacing and sealing earthworks

7.2 Confirm the planting and maintenance of vegetation areas have been carried out

7.3 Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

conduct a work health and safety risk assessment

develop operational procedures

document requirements for structures

estimate quantities and volumes of soil to be moved

implement employment procedures

interpret irrigation designs

supervise workers in:

earth moving and construction procedures

power and pumping plant installation

pump and gated pipe installation

construction of canals, channels, head ditches, beds, check structures, tailwater holding ponds

The candidate must demonstrate knowledge of:

principles and practices of irrigation drainage system installation

components used in drainage systems

drainage appliances, fixtures and fittings

environmental impacts of drainage systems

environmental role of drainage systems

isolation processes and procedures

level and align site

levelling and alignment processes

measuring and monitoring procedures for factors contributing to drainage system performance

positive and negative environmental impacts of drainage systems

regulatory requirements, codes of practice and relevant enterprise service standards relating to blockage removal, disconnection and reconnection activities

soil moisture measurement procedures

types and operational parameters of drains

water authority standards and procedures

water quality monitoring methods and techniques

water table and salinity measures

Range Statement