The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare job
|
|
Materials required for the job are transported to the location and stacked in a safe position. Completed |
Evidence:
|
Tools, equipment and machinery are selected consistent with the requirements of the job. Completed |
Evidence:
|
Quality Assurance requirements are recognised and adhered to. Completed |
Evidence:
|
Personal Protective Equipment (PPE) is used and maintained according to procedures. Completed |
Evidence:
|
Occupational Health and Safety (OHS) hazards are identified and safety concerns reported to the supervisor. Completed |
Evidence:
|
Set out and excavate trenches
|
|
Location and depths of trenches is determined from job drawings. Completed |
Evidence:
|
Trench location is set out with pegs and string line and clearly marked with appropriate marking material. Completed |
Evidence:
|
Manual support is provided to machine operator with excavation of trenches, shoring or battering in accordance with OHS requirements. Completed |
Evidence:
|
Trenches are cleaned out by hand and corners left square. Completed |
Evidence:
|
Trench depths and grades are checked for conformity to job requirements. Completed |
Evidence:
|
Lower and position pipes
|
|
Bedding materials are laid and consolidated to specified depths and grades. Completed |
Evidence:
|
Pipes are installed/lowered into position with appropriate mechanical equipment according to specifications. Completed |
Evidence:
|
Pipe joints and fittings are installed to job specification. Completed |
Evidence:
|
Pipes are back filled to specifications and cover left level with surrounding ground. Completed |
Evidence:
|
Clean up
|
|
Site is cleared and excess soil, debris and unwanted materials removed in accordance with organisational procedures and environmental requirements. Completed |
Evidence:
|
Tools and equipment are cleaned, maintained and stored. Completed |
Evidence:
|