The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Perform pre-start checks for pressurised irrigation system
|
|
Checks of water, power, fuel and lubricants ensure that all are available and the control system is operational. Completed |
Evidence:
|
Pumps are primed, if necessary, and valves and controls are open or closed as directed. Completed |
Evidence:
|
Pressure and flow testing equipment are calibrated and available as required. Completed |
Evidence:
|
Other pre-start system checks are carried out in accordance with manufacturer's requirements and enterprise procedures. Completed |
Evidence:
|
Start up and inspect system
|
|
Start up sequence is implemented in accordance with operations manual. Completed |
Evidence:
|
All malfunctions, leaks and blockages are corrected or repaired immediately and reported in accordance with enterprise procedures. Completed |
Evidence:
|
Pressure at the headworks and control valves is checked against design specifications Completed |
Evidence:
|
Water distributed is checked for even coverage over the targeted areas with minimal wastage and run-off. Completed |
Evidence:
|
Shut down system based upon irrigation indicators
|
|
Water is applied for sufficient time to achieve required soil moisture levels in accordance with irrigation schedule, environmental considerations and allowing for weather conditions. Completed |
Evidence:
|
System components are shut down and drained in sequence in accordance with manufacturer's specifications and enterprise procedures. Completed |
Evidence:
|
Drainage and treatment systems are checked in accordance with enterprise procedures. Completed |
Evidence:
|
Irrigation activities are recorded and in reported accordance with regulatory requirements and enterprise procedures. Completed |
Evidence:
|