The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Locate and identify faulty components and blockages
|
|
Irrigation system and component function is determined by reference to system specifications and technical manuals. Completed |
Evidence:
|
Monitoring and maintenance records are checked and reviewed. Completed |
Evidence:
|
Operational tests are carried out according to system specifications, technical manuals and Occupational Health and Safety (OHS) requirements. Completed |
Evidence:
|
Faulty components and blockages are identified and documented according to enterprise policy and procedures. Completed |
Evidence:
|
Shut down/isolate component
|
|
Shut own sequence and isolation procedures are applied as required according to system specifications and technical manuals. Completed |
Evidence:
|
Safe shutdown or isolation is verified. Completed |
Evidence:
|
Safety/security lock off devices and signage is installed according to enterprise policy and procedures. Completed |
Evidence:
|
Replace faulty components and clear blockages
|
|
Access to faulty components and blockages is arranged. Completed |
Evidence:
|
Faulty components are removed from the system, according to system specifications and technical manuals, and repaired or disposed of in an environmentally responsible way. Completed |
Evidence:
|
Replaceable components are selected from manufacturer catalogues and procured using enterprise procedures. Completed |
Evidence:
|
Replacement components are installed to meet system specifications according to technical manuals. Completed |
Evidence:
|
Replace faulty components and clear blockages are carried out without unnecessary damage to surrounding site and structures. Completed |
Evidence:
|
Blockages are cleared or blocked sections replaced according to enterprise procedures. Completed |
Evidence:
|
Return system to normal operating status
|
|
Isolated or shutdown components are returned to service. Completed |
Evidence:
|
Operational tests are carried out according to system specifications, technical manuals and OHS requirements. Completed |
Evidence:
|
System is returned to normal operational set-up. Completed |
Evidence:
|
Repair activities are reported and recorded according to enterprise policy and procedures. Completed |
Evidence:
|