The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to carry out irrigation drainage system maintenance
|
|
Equipment is selected and checked for safe operation Completed |
Evidence:
|
Appropriate personal protective equipment and tools are selected and used according to Occupational Health and Safety (OHS) requirements Completed |
Evidence:
|
Site is inspected and drainage is assessed Completed |
Evidence:
|
Necessity for repair is established and authorities/persons notified of the intention to commence work Completed |
Evidence:
|
Work requirements are determined from plans, drawings, specifications or instructions Completed |
Evidence:
|
Appropriate drainage and inflow diversion arrangements are made without damage to environment Completed |
Evidence:
|
Equipment and excavation methods are selected and checked to meet safety requirements of task and site Completed |
Evidence:
|
Determine access to drainage lines
|
|
Plan of irrigation system is determined and access points located Completed |
Evidence:
|
Access to drainage lines is obtained to allow blockage to be cleared Completed |
Evidence:
|
Digging is carried out without unnecessary damage to buildings, site, environment or existing fixtures/fittings Completed |
Evidence:
|
Carry out repairs on an irrigation drainage system
|
|
Routine inspections of designated work areas are conducted according to maintenance schedules Completed |
Evidence:
|
System faults are identified and corrective actions are taken according to structure type, location, specification and legislative and organisational requirements Completed |
Evidence:
|
Mechanical equipment is used to open and close drains Completed |
Evidence:
|
Components and associated fittings are repaired or replaced according to manufacturer specifications and organisational requirements Completed |
Evidence:
|
Cast in situ components are constructed according to specifications and organisational requirements Completed |
Evidence:
|
Clear blockages in an irrigation drainage system
|
|
Blockages are cleared Completed |
Evidence:
|
Drainage lines are tested to confirm blockages have been cleared from pipe system Completed |
Evidence:
|
Drainage lines are repaired/resealed to permit normal use Completed |
Evidence:
|
Work area is cleaned and aligned, with debris/waste disposed of according to enterprise, environmental and OHS procedures Completed |
Evidence:
|
Maintain drainage earthworks and equipment |
|
Completed |
Evidence:
|
Earthworks and embankments are checked to meet system requirements
|
|
Drainage area vegetation is managed and maintained Completed |
Evidence:
|
Weeds are controlled on drainage areas Completed |
Evidence:
|
A maintenance program for drainage equipment is implemented and recorded Completed |
Evidence:
|