NTISthis.com

Evidence Guide: AHCLSC202 - Construct low-profile timber or modular retaining walls

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLSC202 - Construct low-profile timber or modular retaining walls

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work

  1. Read work instructions relating to constructing the retaining wall and confirm instructions with the supervisor
  2. Prepare tools and equipment and use according to the supervisor's instructions
  3. Identify and report to supervisor any manual handling and other work health and safety hazards
  4. Select, use and maintain personal protective equipment (PPE) and clothing
  5. Check the quantity and quality of materials to make sure they conform to the requirements of the job plans
  6. Locate and mark out services
Read work instructions relating to constructing the retaining wall and confirm instructions with the supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare tools and equipment and use according to the supervisor's instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and report to supervisor any manual handling and other work health and safety hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, use and maintain personal protective equipment (PPE) and clothing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the quantity and quality of materials to make sure they conform to the requirements of the job plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate and mark out services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark out site for retaining wall

  1. Mark out the position of the retaining wall according to site plans
  2. Determine the location and depth of excavations
  3. Establish profiles to conform to the designated tolerances
  4. Establish survey benchmarks
Mark out the position of the retaining wall according to site plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the location and depth of excavations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish profiles to conform to the designated tolerances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish survey benchmarks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare footings according to industry standards

  1. Excavate foundations for the retaining wall to the required depth and dimensions as designated on the site plans
  2. Remove soil and waste material and stockpile to ensure a safe working area
  3. Locate reinforcing or steps in the excavated site and position accordingly
  4. Position pegs to maintain levels of even depth and horizontal plane to the top of footings
  5. Place, consolidate and finish footings to determined levels, to ensure coverage of reinforcement as necessary
Excavate foundations for the retaining wall to the required depth and dimensions as designated on the site plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove soil and waste material and stockpile to ensure a safe working area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate reinforcing or steps in the excavated site and position accordingly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position pegs to maintain levels of even depth and horizontal plane to the top of footings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place, consolidate and finish footings to determined levels, to ensure coverage of reinforcement as necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare and install retaining wall components

  1. Prepare and lay out components for installation
  2. Mark components to be cut to length and shape, and cut to the requirements of profiles already established
  3. Install drainage media
  4. Construct base layer of retaining wall to a point above the top of the drainage media and form weep holes where indicated
  5. Back-fill and compact fill material behind base of retaining wall
  6. Construct retaining wall components to required dimensions, profiles and levels as specified on the site plans
  7. Set capping to top of retaining wall to specified levels with a tolerance appropriate to the style of capping
Prepare and lay out components for installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark components to be cut to length and shape, and cut to the requirements of profiles already established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install drainage media

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct base layer of retaining wall to a point above the top of the drainage media and form weep holes where indicated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Back-fill and compact fill material behind base of retaining wall

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct retaining wall components to required dimensions, profiles and levels as specified on the site plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set capping to top of retaining wall to specified levels with a tolerance appropriate to the style of capping

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up site and store tools and equipment

  1. Dispose of or recycle soil and waste material from the site to minimise damage to the environment
  2. Store and stack unused construction materials for future re-use
  3. Clean and store all tools and equipment
Dispose of or recycle soil and waste material from the site to minimise damage to the environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store and stack unused construction materials for future re-use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store all tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Read work instructions relating to constructing the retaining wall and confirm instructions with the supervisor

1.2 Prepare tools and equipment and use according to the supervisor's instructions

1.3 Identify and report to supervisor any manual handling and other work health and safety hazards

1.4 Select, use and maintain personal protective equipment (PPE) and clothing

1.5 Check the quantity and quality of materials to make sure they conform to the requirements of the job plans

1.6 Locate and mark out services

2. Mark out site for retaining wall

2.1 Mark out the position of the retaining wall according to site plans

2.2 Determine the location and depth of excavations

2.3 Establish profiles to conform to the designated tolerances

2.4 Establish survey benchmarks

3. Prepare footings according to industry standards

3.1 Excavate foundations for the retaining wall to the required depth and dimensions as designated on the site plans

3.2 Remove soil and waste material and stockpile to ensure a safe working area

3.3 Locate reinforcing or steps in the excavated site and position accordingly

3.4 Position pegs to maintain levels of even depth and horizontal plane to the top of footings

3.5 Place, consolidate and finish footings to determined levels, to ensure coverage of reinforcement as necessary

4. Prepare and install retaining wall components

4.1 Prepare and lay out components for installation

4.2 Mark components to be cut to length and shape, and cut to the requirements of profiles already established

4.3 Install drainage media

4.4 Construct base layer of retaining wall to a point above the top of the drainage media and form weep holes where indicated

4.5 Back-fill and compact fill material behind base of retaining wall

4.6 Construct retaining wall components to required dimensions, profiles and levels as specified on the site plans

4.7 Set capping to top of retaining wall to specified levels with a tolerance appropriate to the style of capping

5. Clean up site and store tools and equipment

5.1 Dispose of or recycle soil and waste material from the site to minimise damage to the environment

5.2 Store and stack unused construction materials for future re-use

5.3 Clean and store all tools and equipment

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Read work instructions relating to constructing the retaining wall and confirm instructions with the supervisor

1.2 Prepare tools and equipment and use according to the supervisor's instructions

1.3 Identify and report to supervisor any manual handling and other work health and safety hazards

1.4 Select, use and maintain personal protective equipment (PPE) and clothing

1.5 Check the quantity and quality of materials to make sure they conform to the requirements of the job plans

1.6 Locate and mark out services

2. Mark out site for retaining wall

2.1 Mark out the position of the retaining wall according to site plans

2.2 Determine the location and depth of excavations

2.3 Establish profiles to conform to the designated tolerances

2.4 Establish survey benchmarks

3. Prepare footings according to industry standards

3.1 Excavate foundations for the retaining wall to the required depth and dimensions as designated on the site plans

3.2 Remove soil and waste material and stockpile to ensure a safe working area

3.3 Locate reinforcing or steps in the excavated site and position accordingly

3.4 Position pegs to maintain levels of even depth and horizontal plane to the top of footings

3.5 Place, consolidate and finish footings to determined levels, to ensure coverage of reinforcement as necessary

4. Prepare and install retaining wall components

4.1 Prepare and lay out components for installation

4.2 Mark components to be cut to length and shape, and cut to the requirements of profiles already established

4.3 Install drainage media

4.4 Construct base layer of retaining wall to a point above the top of the drainage media and form weep holes where indicated

4.5 Back-fill and compact fill material behind base of retaining wall

4.6 Construct retaining wall components to required dimensions, profiles and levels as specified on the site plans

4.7 Set capping to top of retaining wall to specified levels with a tolerance appropriate to the style of capping

5. Clean up site and store tools and equipment

5.1 Dispose of or recycle soil and waste material from the site to minimise damage to the environment

5.2 Store and stack unused construction materials for future re-use

5.3 Clean and store all tools and equipment

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting.

The candidate must provide evidence that they can

read and interpret site and construction plans

identify work health and safety hazards

calculate materials required and mark out the area to be retained

mark out the site and assemble materials

construct footings and place reinforcing

construct retaining walls as specified

clear up the site and dispose of waste

The candidate must demonstrate knowledge of:

the principles and practices of low profile retaining walls

construction approaches and methods

construction materials for retaining walls

safe lifting practices for large and heavy components

methods of disposing soil and waste materials in order to minimise damage to the environment

the environmental effects of altering water flow when installing retaining walls with or without drainage media

the environmental impact of soil disturbance when excavating an area to be retained

Range Statement