The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for installation
|
|
Confirm work instructions with the supervisor Completed |
Evidence:
|
Prepare tools and equipment for use Completed |
Evidence:
|
Check the quantity and quality of materials Completed |
Evidence:
|
Identify and report to supervisor manual handling issues and other work health and safety hazards Completed |
Evidence:
|
Select, use and maintain personal protective equipment (PPE) and clothing Completed |
Evidence:
|
Put in place measures to avoid environmental impacts before starting work Completed |
Evidence:
|
Set out the site for path construction
|
|
Mark out the location of the proposed path Completed |
Evidence:
|
Put public risk protection measures in place Completed |
Evidence:
|
Undertake ground preparation
|
|
Clear the area of debris and excavate to base level Completed |
Evidence:
|
Relocate or dispose of soil and waste materials Completed |
Evidence:
|
Place and compact base material to the required finished level Completed |
Evidence:
|
Install drainage structures Completed |
Evidence:
|
Install edge restraints, where required Completed |
Evidence:
|
Check set out work at regular intervals with supervisor, according to the site plan Completed |
Evidence:
|
Lay surface aggregate materials
|
|
Spread surface aggregate materials over the area to the designated depth Completed |
Evidence:
|
Screed material to ensure consistent depth of materials Completed |
Evidence:
|
Level aggregate materials to the designated level and falls Completed |
Evidence:
|
Compact aggregate materials using appropriate machinery Completed |
Evidence:
|
Make good the site
|
|
Dispose of or recycle soil and waste material from the site Completed |
Evidence:
|
Reinstate areas disturbed by installation works Completed |
Evidence:
|
Clean and store all tools and equipment Completed |
Evidence:
|