The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work
|
|
Plans and specifications are interpreted and clarified with the supervisor. Completed |
Evidence:
|
The quantity and quality of materials are checked to ensure they conform to design drawings and specifications. Completed |
Evidence:
|
Tools and equipment are selected and checked for serviceability according to enterprise guidelines. Completed |
Evidence:
|
Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented. Completed |
Evidence:
|
Environmental implications of installing metal structures are identified and reported to the supervisor. Completed |
Evidence:
|
Set out the site for the structure
|
|
Services are determined and located from site plans. Completed |
Evidence:
|
The position of the structure or feature is marked out according to design drawings and specifications. Completed |
Evidence:
|
Profiles are established to conform to the tolerances nominated within the design drawings and specifications. Completed |
Evidence:
|
Footings are excavated and prepared according to the type of structure or feature to be installed. Completed |
Evidence:
|
Prepare and cut metal components
|
|
Components are laid out ready for assembly to the requirements contained in the design drawings and specifications. Completed |
Evidence:
|
The length of components and the positions of joins are marked out according to designated specifications in design drawings. Completed |
Evidence:
|
Cutting tools are selected, used and maintained according to manufacturer's recommendations and OHS specifications. Completed |
Evidence:
|
Components are cut and joined in preparation for assembly. Completed |
Evidence:
|
Assemble and erect structure
|
|
Metal components are assembled into position and fixed into place according to design drawings and specifications. Completed |
Evidence:
|
Remaining components are installed and fixed into position according to design drawings and specifications. Completed |
Evidence:
|
Structure is finished off to ensure all components are secure and complete. Completed |
Evidence:
|
Coatings are applied according to specifications, manufacturer's recommendations and OHS guidelines. Completed |
Evidence:
|
Check quality of work and clean up site
|
|
Quality of finished work is inspected to ensure the standard of the finished structure or feature is in accordance with design drawings and specifications. Completed |
Evidence:
|
Debris is cleaned from structure and site according to enterprise guidelines. Completed |
Evidence:
|
Waste material is disposed of in an environmentally aware and sensitive manner. Completed |
Evidence:
|
Unused metal components are stored for future re-use according to enterprise guidelines. Completed |
Evidence:
|
Tools and equipment are cleaned and stored according to enterprise guidelines. Completed |
Evidence:
|